Integrated transport system
Contents |
[edit] Introduction
Integrated transport involves the combining of different modes of transport to maximise ease and efficiency for the user in terms of time, cost, comfort, safety, accessibility and convenience.
Different modes of transport have differing technical and operational capabilities. Each mode of transport in the system has to develop its capacity to meet specific demand viewed within the total demand for all modes of transport in the system. In this way, as well as competing with each other, they also supplement each other.
A successful integrated transport system should result in higher demand for public transport, with a knock-on reduction in congestion and pollution.
Some examples of integration between transport modes, which make up part of the overall system, include:
- Street trams located in large pedestrian zones outside railway station entrances for ease of interchange.
- Stations that combine bus, train, subway/tube services.
- Circulation systems – escalators, lifts, and so on – that provide easy access to different forms of transport.
- Same-level interchange between different systems.
- Bicycle storage capacity on buses/trains.
- Park and ride facilities.
- Route planners that include different modes of transport.
- Maps within different modes of transport showing interchanges with other systems.
- Timetables that optimise transfers between systems.
- Ticketing that allows transfers between systems.
[edit] Planning techniques
A successfully integrated transport system involves the coordination and optimisation of timetables, to ensure that users do not have undue waiting times between different modes. The central aim should always be the decrease in time of the user’s journey from the origin to destination.
[edit] Integrated planning
One of the primary challenges in integrating systems is the coordination of the different agencies responsible for different transport modes, some of which will be privately-operated. Coordinated planning ensures easy interchange, in terms of both proximity and time, resulting in trips with minimum disruption.
This is also important in terms of providing real-time service information, allowing users to make informed decisions in response to changing infrastructure situations, such as train delays or flight cancellations.
[edit] Integrated infrastructure
This involves the seamless connection of various transport modes. For example, the connection of park-and-ride facilities and stations; connections between cycleways and public transport; connections between public transport and retail/commercial centres that are popular destinations.
[edit] Integrated operations
This involves the coordination of infrastructure and planning, to ensure seamless connections between, for example, bus-to-bus, bus-to-train, bus-to-ferry, and so on. Rather than acting purely in competition with each other, the modes need to complement each other. Operationally, this can include integrated ticketing and fares to enable user transfer without financial penalty.
[edit] Related articles on Designing Buildings
- Boosting electric vehicle use.
- Collaboration needed to deliver national and regional transport strategies.
- Compliant public transport node.
- Connecting England's Economic Heartland.
- Car park.
- Cycling and walking plan.
- Designing smart cities.
- Highway authority.
- Hyperloop
- Infrastructure.
- Integrated systems.
- Intermodal transport.
- Kiss and ride.
- Movement network.
- Multi-storey car park.
- Road traffic management.
- Safe pedestrian route.
- Smart village trials autonomous shuttle and private mobile network.
- Sustainable transport.
- The case for a new road-user charging scheme in London
- The future of transport in the UK.
- Traffic and transport.
- Transport assessment.
- Transport design and health.
- Travel plan.
- Underground car park.
- Union Connectivity Review calls for UK-wide strategic transport network.
- Walking distance.
- Williams-Shapps Plan for Rail.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.