Habitat management and monitoring plan HMMP
A habitat management and monitoring plan (HMMP) is a detailed plan that outlines how a parcel of land will be managed over at least 30 years to create and enhance habitats for biodiversity net gain (BNG) as well as to manage and monitor the BNG.
The government encourages use of a HMMP to capture management and monitoring information for significant on-site enhancements and off-site gains. Planning authorities are also encouraged to set any specific and proportionate monitoring requirements as part of planning conditions and obligations used to secure off-site or significant on-site habitat enhancements.
Natural England have published a template to help structure management and monitoring plans to demonstrate how habitat creation, enhancement, management and monitoring will be undertaken. The template tool can be used for projects of all sizes and for both on-site and off-site units, specified by any development project, consenting body or landowner to provide the management and monitoring information for the project or site in a standardised and consistent format.
It includes the Habitat Management and Monitoring Plan template, a companion document which contains templates for each broad habitat type used in the statutory biodiversity metric, assisting with the environmental information, creation, enhancement, management and monitoring parts.
https://publications.naturalengland.org.uk/publication/5813530037846016#
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February