Habitat management and monitoring plan HMMP
A habitat management and monitoring plan (HMMP) is a detailed plan that outlines how a parcel of land will be managed over at least 30 years to create and enhance habitats for biodiversity net gain (BNG) as well as to manage and monitor the BNG.
The government encourages use of a HMMP to capture management and monitoring information for significant on-site enhancements and off-site gains. Planning authorities are also encouraged to set any specific and proportionate monitoring requirements as part of planning conditions and obligations used to secure off-site or significant on-site habitat enhancements.
Natural England have published a template to help structure management and monitoring plans to demonstrate how habitat creation, enhancement, management and monitoring will be undertaken. The template tool can be used for projects of all sizes and for both on-site and off-site units, specified by any development project, consenting body or landowner to provide the management and monitoring information for the project or site in a standardised and consistent format.
It includes the Habitat Management and Monitoring Plan template, a companion document which contains templates for each broad habitat type used in the statutory biodiversity metric, assisting with the environmental information, creation, enhancement, management and monitoring parts.
https://publications.naturalengland.org.uk/publication/5813530037846016#
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.