Digitally built britain
Contents |
[edit] Introduction
All central government funded projects should have been delivered using 3D collaborative BIM by 2016. This initiative was later defined as BIM Level 2 and detailed in various published specifications over a 5-year period until it was eventually superseded in 2018 by a new international standard, BS EN ISO 19650.
Yet still, ISO 19650 has not been adopted by even half the industry yet, and some sectors haven’t been touched by it at all.
It’s no wonder then that the industry largely has a level of scepticism as to the importance and necessity of the standard, but it will become mandatory, probably sooner than we all think.
According to a survey of nearly 500 construction businesses based in the UK, we believe as an industry that our work will be fully compliant with ISO 19650 by 2027. Just 5 years from now.
[edit] Complying to ISO 19650
That’s not a government target. It’s not a forecast made by an industry body. It’s what the industry says, the people on the ground delivering projects.
Maybe it won’t be government targets or mandates that are the driving force behind digital transformation, but other legislation such as the Building Safety Bill; this will in effect be a mandate as it will be putting a legal responsibility on building owners and those who build their assets.
What’s so frustrating is the misconception carried across the industry, by those who aren’t fully aware of what is required to comply. Probably due to the way in which the first iteration was written and after so many amendments, who can blame the industry for misunderstanding?
ISO 19650 is commonly referred to as BIM. In fact, the word (or acronym) BIM is bandied around a lot, without full appreciation of what it means to be BIM compliant.
[edit] BIM
Most of the misconception has been brought about by what BIM stands for. Building Information Modelling. Therefore, when people think about BIM, they think about models. To try and counter this, we like to promote that the M in BIM should stand for management, rather than modelling. BIM could (should) stand for Building Information Management – where the information is derived from data and documentation collected at every stage of the project lifecycle, not just models.
BIM is the accepted and recognised term, associated with ISO 19650, but those who are ISO 19650 compliant will know that the most important element of a BIM enabled project is the quality of the data which is held for that project. That data should cover the project’s whole lifecycle, from conception through to a digital O&M manual and enabling the whole operational phase through to demolition and repurpose.
[edit] Managing Data
Traditionally, project information collated through the various stages of a construction project has caused much frustration when it comes to the building handover. Too often there is a lack of any structure due to it being gathered from a vast number of different sources in an inconsistent way. It will be largely unsearchable and because it hasn’t been managed throughout and updated as necessary, it will be flawed, full of gaps and ultimately, considered unreliable come project handover.
In today’s world, digital management of data allows repetitive tasks to be automated, increasing efficiency and ensuring accuracy. Introducing structure and search functionality allows for reliable data at handover, but it also ensures ease of access to data which can be used and re-used for multiple purposes throughout the project lifecycle.
The most important benefit of a BIM enabled project is the ability to save time, reduce risk and increase profitability. And this can't be said loud enough - it's not just about models!
To create a digitally built Britain, everyone across the supply chain from the beginning of a project to the very end, should be involved in managing digital data and converting their processes. With this, the construction industry has larger potential to expand and create more innovative methods of working. As an industry, we must understand the business specific requirements and align them with the industry standards to advance towards a digitally built Britain.
--AIMIS Written by Matt Samways, Managing Director of AIMIS
[edit] Related articles on Designing Buildings
- BIM.
- BIM articles.
- Centre for Digital Built Britain.
- Defining the digital twin: seven essential steps.
- Digital engineering.
- Digital Built Britain v BIM.
- Digital information.
- Digital model.
- Digital technology.
- Digital twin.
- Digitalisation.
- Digitisation.
- Digitise.
- How to make the digital revolution a success.
- Immersive Hybrid Reality IHR.
- Internet of things.
- Smart contracts.
- UK digital strategy.
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.