Proof of Delivery POD
Proof of Delivery (POD) or what might commonly be called a delivery note is normally a document produced by a supplier as evidence that an order of goods has been delivered. It normally requires the customer or receiver to acknowledge the receipt of the goods, often by a signature and a name, particularly if received on a construction site and form part of logistics in construction.
A proof of delivery (POD) might also serve the purpose of a goods received note (GRN), although in general a GRN is an internal document produced by the customer to confirm receipt of goods and track against delivery notes, order purchases and invoices.
Proof of delivery or delivery notes acknowledge the delivery of goods to a customer by a supplier and confirms that the goods have been received in a suitable condition by the customer. These documents differ from Goods Despatched Notes (GDN) which are merely suppliers documents confirming a delivery has bee shipped from its manufacturing base.
The POD is the record of goods that the buyer has received, and normally contains a description of the goods, the quantity of goods, the date of delivery and the individual who inspected the goods. It used by the supplier as evidence incase of any later query and might also be used by buyer to compare the goods ordered to those delivered. It is normally completed or signed following a brief inspection of the items, their condition and number. A copy might then be retained by the customer to compare to the supplier invoices or purchase orders for a particular project as well as the bills of quantities.
The information in the PODs collected from a construction project can become significant as a body of information for contractual purposes in relating the contractor performance to that of the agreed construction programme or agreed costs. These can become especially important in scenarios where damaged goods or late deliveries have knock on effects causing programme or completion delays that have cost implications.
PODs and or GRNs may also increasingly be used as evidence requirements for building or site environmental performance assessments, confirming the materials actually used in a building project, for example assessing product and site emissions, known as cradle to gate and gate to site emissions. They may also be a key part of any waste reduction programme both from the perspective of the over ordering of materials but also in terms of waste packaging.
[edit] Related articles on Designing Buildings
- BSI construction product identification system.
- Call-off contract.
- Construction buyer.
- Construction consolidation centre (CCC).
- Construction inventory management.
- Construction logistics manager.
- Construction logistics plan.
- Construction Logistics and Community Safety.
- Fleet operator.
- Fleet Operator Recognition Scheme.
- Forward-logistics.
- How to manage construction plant.
- Inventory.
- Lean construction.
- Lean construction - a quality perspective.
- Logistics data.
- Materials on site.
- Off site materials.
- Programme for building design and construction.
- Resource management.
- Reverse-logistics.
- Scheduling construction activities.
- Site logistics.
- Site storage.
- Supply chain management.
- Understanding agile in project management.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.