Proof of Delivery POD
Proof of Delivery (POD) or what might commonly be called a delivery note is normally a document produced by a supplier as evidence that an order of goods has been delivered. It normally requires the customer or receiver to acknowledge the receipt of the goods, often by a signature and a name, particularly if received on a construction site and form part of logistics in construction.
A proof of delivery (POD) might also serve the purpose of a goods received note (GRN), although in general a GRN is an internal document produced by the customer to confirm receipt of goods and track against delivery notes, order purchases and invoices.
Proof of delivery or delivery notes acknowledge the delivery of goods to a customer by a supplier and confirms that the goods have been received in a suitable condition by the customer. These documents differ from Goods Despatched Notes (GDN) which are merely suppliers documents confirming a delivery has bee shipped from its manufacturing base.
The POD is the record of goods that the buyer has received, and normally contains a description of the goods, the quantity of goods, the date of delivery and the individual who inspected the goods. It used by the supplier as evidence incase of any later query and might also be used by buyer to compare the goods ordered to those delivered. It is normally completed or signed following a brief inspection of the items, their condition and number. A copy might then be retained by the customer to compare to the supplier invoices or purchase orders for a particular project as well as the bills of quantities.
The information in the PODs collected from a construction project can become significant as a body of information for contractual purposes in relating the contractor performance to that of the agreed construction programme or agreed costs. These can become especially important in scenarios where damaged goods or late deliveries have knock on effects causing programme or completion delays that have cost implications.
PODs and or GRNs may also increasingly be used as evidence requirements for building or site environmental performance assessments, confirming the materials actually used in a building project, for example assessing product and site emissions, known as cradle to gate and gate to site emissions. They may also be a key part of any waste reduction programme both from the perspective of the over ordering of materials but also in terms of waste packaging.
[edit] Related articles on Designing Buildings
- BSI construction product identification system.
- Call-off contract.
- Construction buyer.
- Construction consolidation centre (CCC).
- Construction inventory management.
- Construction logistics manager.
- Construction logistics plan.
- Construction Logistics and Community Safety.
- Fleet operator.
- Fleet Operator Recognition Scheme.
- Forward-logistics.
- How to manage construction plant.
- Inventory.
- Lean construction.
- Lean construction - a quality perspective.
- Logistics data.
- Materials on site.
- Off site materials.
- Programme for building design and construction.
- Resource management.
- Reverse-logistics.
- Scheduling construction activities.
- Site logistics.
- Site storage.
- Supply chain management.
- Understanding agile in project management.
Featured articles and news
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.