Perpend
The term ‘perpend’ (perp or cross joint) refers to the vertical joints between blocks or bricks that have been laid in a horizontal course to form a wall. Perpends are normally filled and sealed with mortar. The horizontal mortar joint in a wall construction is typically referred to as the bed joint.
Rather than being filled with mortar, perpends may also be left open to form weep holes or cavity ventilators. These provide openings that allow the drainage of moisture from within a wall construction and allow ventilating air to the back of a wall to help prevent mildew, dry rot and damp. They are generally formed by plastic inserts into the perpends, as these form a more uniform opening compared to simply leaving a void. See weep holes for more information.
A perpend stone is a long stone that extends between the inner and outer layers of a stone wall, tying the two layers together. The stone is ‘dressed’ at both ends.
The term ‘perpend’ may also be used more generally to refer to any brick or stone the longest dimension of which is perpendicular to the face of the wall. See bond stone.
The expression “keeping the perpends” is a term used to describe what happens when cross joints or transverse joints in brickwork are maintained in a perpendicular line.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.