Users of buildings
In the construction industry, the term ‘user’ or ‘users’ typically refers to any persons, groups or organisations who use property or land as an occupier, owner, tenant, visitor or other stakeholder. For example, members of the public might be users of shops, hospitals, libraries, and so on.
A user can also be referred to as an end-user, which indicates that the ‘end’ is the completion of building, i.e. when it can be used for its designed purpose. A common domestic building end-user is a resident, that is, an individual who uses the building as a residence on a permanent or long-term basis.
The type of users will depend on the use class of a building, i.e. what it is used for. The Town and Country Planning (Use Classes) Order categorises uses of land and buildings. Developments may not be used for purposes that are not within the use class for which they received planning permission.
For example, the users of an office building will include those who use the building as their place of work; the users of school building will include those who attend the school as pupils, those who attend the school as employees (i.e. teachers, support staff), and those who attend the school at open events, such as parents; the users of a hotel building will be those who pay to stay in the hotel as guests and those who work there as staff, and so on.
The users of a building may be very diverse, and may have conflicting needs. It is very important therefore that all user groups are properly represented when developing the brief and design for a new building, or for changes to an existing building.
User panels are specialist groups made up of people who will use a development when it is completed and who can contribute to briefing and design development. User panels might be involved in the development of:
- The strategic brief.
- The project brief.
- The concept design.
- The detailed design.
- Key components of the technical design.
It is common for a non-technical 'building user’s guide' (BUG) to be published on completion of a building, containing information for users about various things such as the principles behind the design of the building and how these affect its operation, the building's standard of performance, energy efficiency measures, access, security and safety systems, and so on. The building user's guide should be written as if the user knows nothing about the systems being described.
There may also be a building owner's manual and a technical guide.
It is good practice to obtain feedback from users about the performance of completed developments to help correct defects, fine tune systems and compile lessons learned than may be relevant for future projects. For more information, see Soft landings.
NB Smart Building Overlay to the RIBA Plan of Work, published by the RIBA in 2024, states: ‘Smart buildings put focus on designing the experience of buildings for users – making them human-centric rather than technology-centric.’
[edit] Related articles on Designing Buildings
- Building owner's manual.
- Building users guide.
- Client.
- Customer.
- End-user.
- How to write a building user guide.
- Occupier.
- Resident.
- Stakeholders.
- Tenant.
- Usability.
- Use class.
- User acceptance.
- User experience.
- User interface platforms.
- User journeys.
- User panels.
- User personas.
- User stories.
- Visitor flow.
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Comments