Cycle storage
For the purposes of the Home Quality Mark, cycles may be stored in any of the following locked structures:
- Garages or sheds.
- Internal private spaces, such as dedicated spaces in a utility room.
- External or internal communal cycle stores.
- Proprietary systems.
Communal cycle storage should meet the following criteria:
- Spaces should be in racks that are covered overhead, and the racks should be fixed to a permanent structure (such as a building or hardstanding).
- Where the location is external to the home, access from the bike storage area to a pedestrian or cycle route is not permitted through the home.
The distance between each cycle rack and surrounding obstructions (e.g. walls) should allows for bikes to be easily stored and accessed.
Cycle racks must be a minimum of:
- 2m long × 0.75m wide for one bike.
- 2m long × 1.5m wide for two bikes.
- 2m long × 2.5m wide for four bikes.
- If hanging systems or proprietary systems are provided, the space requirements are flexible but the system must allow each cycle to be removed independently.
Cycle storage in communal locations should have adequate lighting that must be controlled during daylight hours.
Ref Home Quality Mark One, Technical Manual SD239, England, Scotland & Wales, published by BRE in 2018.
[edit] Related articles on Designing Buildings Wiki
- Are electric bikes the future?
- BRE articles.
- BREEAM Cyclist Facilities.
- BREEAM.
- Car sharing
- China has just built the world’s longest elevated cycle path.
- CIBSE Case Study Olympic Velodrome.
- Cycling and walking plan.
- Cycle route.
- Dedicated and safe cycle lane.
- Home Quality Mark.
- London car charging infrastructure.
- Sustainable transport.
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.