Cycle storage
For the purposes of the Home Quality Mark, cycles may be stored in any of the following locked structures:
- Garages or sheds.
- Internal private spaces, such as dedicated spaces in a utility room.
- External or internal communal cycle stores.
- Proprietary systems.
Communal cycle storage should meet the following criteria:
- Spaces should be in racks that are covered overhead, and the racks should be fixed to a permanent structure (such as a building or hardstanding).
- Where the location is external to the home, access from the bike storage area to a pedestrian or cycle route is not permitted through the home.
The distance between each cycle rack and surrounding obstructions (e.g. walls) should allows for bikes to be easily stored and accessed.
Cycle racks must be a minimum of:
- 2m long × 0.75m wide for one bike.
- 2m long × 1.5m wide for two bikes.
- 2m long × 2.5m wide for four bikes.
- If hanging systems or proprietary systems are provided, the space requirements are flexible but the system must allow each cycle to be removed independently.
Cycle storage in communal locations should have adequate lighting that must be controlled during daylight hours.
Ref Home Quality Mark One, Technical Manual SD239, England, Scotland & Wales, published by BRE in 2018.
[edit] Related articles on Designing Buildings Wiki
- Are electric bikes the future?
- BRE articles.
- BREEAM Cyclist Facilities.
- BREEAM.
- Car sharing
- China has just built the world’s longest elevated cycle path.
- CIBSE Case Study Olympic Velodrome.
- Cycling and walking plan.
- Cycle route.
- Dedicated and safe cycle lane.
- Home Quality Mark.
- London car charging infrastructure.
- Sustainable transport.
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.