For the purposes of the Home Quality Mark, cycles may be stored in any of the following locked structures:
- Garages or sheds.
- Internal private spaces, such as dedicated spaces in a utility room.
- External or internal communal cycle stores.
- Proprietary systems.
Communal cycle storage should meet the following criteria:
- Spaces should be in racks that are covered overhead, and the racks should be fixed to a permanent structure (such as a building or hardstanding).
- Where the location is external to the home, access from the bike storage area to a pedestrian or cycle route is not permitted through the home.
The distance between each cycle rack and surrounding obstructions (e.g. walls) should allows for bikes to be easily stored and accessed.
Cycle racks must be a minimum of:
- 2m long × 0.75m wide for one bike.
- 2m long × 1.5m wide for two bikes.
- 2m long × 2.5m wide for four bikes.
- If hanging systems or proprietary systems are provided, the space requirements are flexible but the system must allow each cycle to be removed independently.
Cycle storage in communal locations should have adequate lighting that must be controlled during daylight hours.
Ref Home Quality Mark One, Technical Manual SD239, England, Scotland & Wales, published by BRE in 2018.
[edit] Related articles on Designing Buildings Wiki
- Are electric bikes the future?
- BRE articles.
- BREEAM Cyclist Facilities.
- BREEAM.
- Car sharing
- China has just built the world’s longest elevated cycle path.
- CIBSE Case Study Olympic Velodrome.
- Cycling and walking plan.
- Cycle route.
- Dedicated and safe cycle lane.
- Home Quality Mark.
- London car charging infrastructure.
- Sustainable transport.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.