Atlantis, The Palm
Contents |
[edit] Introduction
Atlantis, The Palm is a five-star ocean-themed resort hotel on the apex of the man-made Palm Island’s crescent, Dubai, UAE. The building was the first to be built on the island and is based around the myth of Atlantis, as depicted in the works of Plato. The main building has two central towers, referred to as East and West, joined together by the Royal Bridge Suite.
The 46 hectare resort comprises 1,539 rooms, 23 restaurants, luxury boutiques, and a 17 hectare nautical-themed water park and tropical gardens containing more than 250,000 plants and trees. A key feature of the water park is the Leap of Faith slide; a 60 ft drop at an 86-degree angle from the top of a replica Mayan temple. It propels riders through a clear acrylic tunnel submerged in a shark-filled lagoon.
The resort includes one of the largest open-air marine habitats in the world, containing approximately 65,000 marine animals in lagoons and other displays. Three-storey underwater suites allow guests to literally ‘sleep with the fishes’.
Atlantis was developed as a joint venture between Kerzner International Holdings Ltd. and Istithmar, and officially opened in September 2008. The construction cost was reported to be US$1.5 bn. In April 2012, Istithmar acquired Kerzner’s 50% stake in the property for US$ 250m. The property continues to be managed by Kerzner International Resorts.
Atlantis has become a landmark tourist attraction and an iconic symbol of Dubai’s place on the world-stage.
[edit] Design and construction
Atlantis was designed by Wimberly, Tong and Goo, an international firm specialising in luxury hotel complexes.
The design incorporates classical Arabian architecture in both the interior and exterior of the 23-storey hotel, with semi-precious stones, intricate fossilised shells and 'fish' stones included throughout. A 10 m-high glass sculpture by artist Dale Chihuly contains more than 3,000 pieces of intensely-coloured blown glass ranging from fiery oranges and reds to tranquil blues and greens, surrounded by a reflection pool. The hotel lobby's 19 m-high arched ceilings feature 8 hand-painted murals by Spanish artist Albino Gonzalez.
The contractor, Laing O’Rourke, developed the hotel envelope using a modular precast glass-fibre/reinforced concrete façade, which was installed by their in-house specialists Emirates Precast. They also developed a pioneering facility to pre assemble modular bathroom ‘pods’ in a controlled factory environment. 1,500 pods were delivered direct to the site and installed at a rate of 38 per week.
The logistical operation to facilitate the build of the intricate design presented challenges. A highly complex operation was set up involving road deliveries, handling and distribution, temporary utilities, communication systems, traffic management and an enormous amount of on-site labour. At its peak, a workforce of 10,000 were employed, working 2 million hours a month.
It was completed 2 months ahead of schedule.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Building of the week series.
- Burj al Arab, Dubai.
- Luxor Las Vegas.
- MahaNakhon, Bangkok.
- Petronas Twin Towers.
- Ryugyong Hotel, North Korea.
- Shanghai Tower.
- Taipei 101.
- Top 10 skyscrapers located in the UAE.
- Top Architectural Wonders of Dubai.
- Unusual building design of the week.
[edit] External resources
- Atlantis, The Palm - Official site
- Laing O'Rourke - Atlantis
Featured articles and news
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.