Alternative Contract Value
In the UK construction industry, "Alternative Contract Value" (ACV) typically refers to an alternative valuation of the works or services provided under a construction contract. This is a crucial concept for managing financial aspects of construction projects, ensuring that both parties are fairly compensated for any changes and that the project remains on track financially.
This term can arise in various contexts, including:
- Variations and changes - When there are changes or variations to the original scope of work, the contract value may need to be adjusted. The ACV represents the new value of the contract after these changes are considered. It ensures that both the contractor and the client have a clear understanding of the revised financial implications of the altered scope.
- Dispute resolution - In situations where there is a dispute over the value of completed work, an alternative valuation may be proposed. This can be part of an adjudication, arbitration, or negotiation process. The ACV would be the value agreed upon or determined as a fair and reasonable assessment of the work done.
- Tendering process - When contractors submit tenders they might propose alternative solutions or methods to achieve the project goals. The ACV in this context would be the cost associated with these alternative proposals, providing a basis for comparison with the original tender value.
- Cost management - ACV can be used in cost management to refer to the re-evaluation of project costs at different stages. This helps in maintaining control over the budget and ensuring that the project remains financially viable despite any unforeseen circumstances.
[edit] Related articles on Designing Buildings
- Code of Estimating Practice.
- Evaluation of claims.
- Fixed charge.
- Fluctuations.
- Force account work.
- Guaranteed maximum price.
- Lump sum contract.
- Lump sum contract - pros and cons.
- Negotiated contract.
- Open-book accounting.
- Price.
- Procurement route.
- Provisional sums.
- Relevant events.
- Target cost contract.
- Time and material contract (T&M).
- Traditional contract - pros and cons.
- Variations.
Featured articles and news
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.