Dry-bulb temperature
Dry-bulb temperature (Tdb, DBT or Td), is a measure of air temperature. It is referred to as dry-bulb temperature because the thermometer bulb is dry and so the temperature recorded does not vary with the moisture content of the air. This is as opposed to wet-bulb temperature which is the temperature recorded by a thermometer that has its bulb wrapped in cloth and moistened with distilled water. Wet-bulb temperatures are the same as dry-bulb temperatures at a relative humidity of 100%, but otherwise wet-bulb temperatures will be lower than dry-bulb temperatures due to the cooling effect of evaporation (described as wet-bulb depression).
A sling psychrometer holds both wet and dry-bulb thermometers and can be used to express the physical and thermal properties of moist air on a psychrometric chart.
Dry-bulb temperature can be measured by a thermometer exposed to the air but shielded from radiation and moisture. It can be expressed in Celsius (C), Fahrenheit (F) or Kelvin (K).
Dry-bulb temperature can be used as to express a component of thermal comfort. For example, the wet bulb globe temperature index (WBGT) is widely used for the assessment of heat stress and combines wet-bulb temperature, dry-bulb temperature and globe temperature (mean radiant temperature).
[edit] Related articles on Designing Buildings
Featured articles and news
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.