Inner room definition
Approved document B, Fire Safety, Volume 1 Dwelling houses, defines an 'inner room' as a:
'Room from which escape is possible only by passing through another room (the access room).'
An inner room is at risk if a fire starts in the other room (the access room - that is, a room through which the only escape route from an inner room passes).
This situation may arise with open-plan layouts and galleries.
Such an arrangement is only acceptable where the inner room is:
- A kitchen.
- A laundry or utility room.
- A dressing room.
- A bathroom, WC, or shower room.
- Any room on a storey that is a maximum of 4.5m above ground level which is provided with an emergency escape window as described in paragraph 2.10.
- A gallery that complies with paragraph 2.15.
A room accessed only via an inner room (an inner inner room) is acceptable when all of the following apply:
- It complies with paragraph 2.11.
- The access rooms each have a smoke alarm (see Section 1).
- None of the access rooms is a kitchen.
[edit] Related articles on Designing Buildings Wiki
- Approved documents.
- Automatic release mechanism.
- Door energy rating.
- Fire detection and alarm systems.
- Fire door.
- Fire Door Inspection Scheme.
- Fire Prevention on Construction Sites.
- Fire protection engineering.
- Joint fire code.
- Separating floor.
- The Regulatory Reform (Fire Safety) Order 2005.
- Unprotected escape route.
- Visual alarm devices - their effectiveness in warning of fire.
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.