Welfare facilities on construction sites
Contents |
[edit] Introduction
There is a legal duty under The Workplace (Health, Safety and Welfare) Regulations 1992, as amended by The Construction (Design and Management) Regulations (CDM Regulations) to ensure that appropriate and adequate welfare facilities are provided at most workplaces.
The provision of welfare facilities should be considered at the planning stages of a project to ensure they are appropriately located.
The CDM regulations require that contractors, as far as is reasonably practicable, provide welfare facilities which meet the minimum requirements set out in Schedule 2 of the regulations for their own employees working on site or anyone else working under their control.
On projects where there is more than one contractor, the client and the principal contractor have a similar duty to ensure suitable and sufficient welfare facilities are provided for before any construction work starts and for the duration of the construction work. The principal contractor should liaise with other contractors involved in the project to ensure appropriate welfare facilities are provided. This should continue throughout the construction phase to take account of any changes which might change the requirement for the provision of welfare facilities.
Schedule 2 of the regulations suggests that the minimum welfare facilities required includes:
- Sanitary conveniences
- Washing facilities
- Drinking water
- Changing rooms and lockers
- Facilities for rest.
[edit] Sanitary conveniences
Clean and tidy toilets (sanitary conveniences) should be provided at easily accessible locations. They should have adequate ventilation and lighting. Ideally, separate male and female toilets should be provided but if this is not possible, as a minimum, rooms with lockable doors are required.
[edit] Washing facilities
Clean and tidy washing facilities with sufficient ventilation and lighting are required next to both toilets and changing areas with the following:
- Hot and cold running water.
- Soap or other cleaning agents.
- Towels or another method for drying hands.
- Showers may be required depending on the nature of the works.
Ideally, separate male and female facilities should be provided but if this is not possible, as a minimum, rooms with lockable doors are required.
[edit] Drinking water
An adequate supply of suitably signed drinking water is required, with suitable cups or other drinking vessels, unless the supply of drinking water is in a jet from which can be drunk easily.
[edit] Changing rooms and lockers
If employees are required to change into specialist clothing, separate male and female changing facilities are required with seating and secure areas for storing personal clothing and protective clothing. In addition facilities for drying wet clothing are required.
[edit] Rest facilities
Adequately heated rest facilities with the appropriate number of seats and tables are required, along with a method for heating drinks and warming food. Where necessary, they should include suitable facilities for a pregnant woman or a nursing mother to rest lying down.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A briefing on fall protection systems for designers
A legal requirement and an ethical must.
CIOB Ireland launches manifesto for 2024 General Election
A vision for a sustainable, high-quality built environment that benefits all members of society.
Local leaders gain new powers to support local high streets
High Street Rental Auctions to be introduced from December.
Infrastructure sector posts second gain for October
With a boost for housebuilder and commercial developer contract awards.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
COP29; impacts of construction and updates
Amid criticism, open letters and calls for reform.
The properties of conservation rooflights
Things to consider when choosing the right product.
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.
Embodied Carbon in the Built Environment
Overview, regulations, detail calculations and much more.
Why the construction sector must embrace workplace mental health support
Let’s talk; more importantly now, than ever.
Ensuring the trustworthiness of AI systems
A key growth area, including impacts for construction.