Water impoundment licence
Water impoundment refers to structures within inland waters that can permanently or temporarily change the water level or flow, such as:
- Dams.
- Weirs.
- Fish passes.
- Hydropower turbines.
- Sluices.
- Penstocks.
- Culverts.
- Lock gates.
- Retaining walls.
- Flumes.
- Reservoir embankments.
- Temporary diversions during construction work.
Ref https://www.gov.uk/guidance/water-management-abstract-or-impound-water#impoundment
It is necessary to have an appropriate licence before work begins on a water impoundment structure - even in the case of an emergency. For more information, see Apply for a water abstraction or impoundment licence. There are certain impoundment activities with low environmental risks or other conditions where exemptions to this rule may apply.
The Environment Agency may take enforcement action against those who do not apply before impounding water. Further details are available from Water management: abstract or impound water
[edit] Related articles on Designing Buildings
- Environment Agency.
- Environmental engineering.
- Environmental impact assessment EIA.
- Hydrogeological Impact Appraisal HIA.
- Passive dewatering.
- Raising awareness of dewatering regulation.
- Water abstraction licence.
- Water engineering.
- Water management.
[edit] External resources
Featured articles and news
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.