Power over USB
The Universal Serial Bus (USB) is designed to provide power as well as data communications. It can support 127 devices and has developed over the years from 1.5 Mb/s to 480 Mb/s. Currently (2014) a normal USB 2.0 has a low current limit of 100 mA and a high current limit of 500 mA at 5 V although a Thunderbolt connector is able to deliver 2 A at 5 V. Several years ago USB 3.0 was introduced which increased the theoretical bit rate by 10x’s to 5 Gb/s and raised the low current limit to 150 mA and the high current limit to 900 mA. More recently the USB 3.0 Promoter Group has announced a new specification which will allow USB 3.0 compatible sockets and cables to deliver up to 100 W by changing the voltage from 5 V to 20 V and increasing the current to 5 A.
USB also has limitations on the maximum cable length and in most cases this is restricted to 3m. With special cables this can be increased to over 6 m and with a USB bridge this can be extended to over 30 m. With such a large increase in power a single USB 3 SuperSpeed hub could be charging a laptop, powering an external hard drive as well as a second monitor. In future, TV manufacturers could include high-powered USB hubs to power nearby AV and communication equipment thereby reducing the need for multiple wall outlets.
Both USB and PoE (power over ethernet) bring power and communication functions together by using the data exchange capabilities to negotiate power need with the device in a number of incremental stages. This level of power control allows a common supply to deliver a range of different power profiles best suited to whichever device is connected to that particular port. For example, in the future a USB 3 might provide 60 W (20 V at 3 A) for a laptop or 5 to 10 W (5 V at 1 or 2 A) for an average smart phone.
The benefit of both of these systems is that they are well developed solutions that are supported by appropriate standards, research and testing. Components are readily available and system design expertise is relatively common.
In terms of network distribution efficiency both PoE and USB are still subject to conversion and distribution losses as any other network. Whilst a modern PoE injector may have a very efficient power supply, power is still converted from 230 V AC to approximately 50 V DC, distributed to the point-of-load and then converted again to what’s required by the end device. In the case of PoE the voltage is higher than USB potentially reducing its distribution losses although conductor sizes are relatively small.
In the domestic environment USB ports are much more common and could in the future be used not just for connecting between devices, for example a laptop and a peripheral, but also as an additional low voltage power outlet complimenting the existing 230 V wall outlet. This may reduce the need for individual power adapters and bulky 230 V plugs and sockets although where this is the case, USB sockets are still likely to be associated with a central device such as a TV or computer.
This article was created by --BRE. It was taken from The future of electricity in domestic buildings, a review, by Andrew Williams, published in November 2014.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.