Uninterrupted power supply for buildings
An uninterrupted power supply (UPS), sometimes referred to as an uninterruptible, or uninterruptable power supply, provides an alternative ‘no-break’ electrical supply that can be required in situations where it is important there is no loss of electrical supply, even if the primary supply fails.
Typically this is necessary where a loss of power could result in a risk to health or disruption to business, for example:
- Emergency services and medical facilities.
- Leisure and sports venues where scheduled and ticketed events take place.
- Data centres.
- Financial services.
- Some industrial processes.
It might also be necessary to support specific critical services, such as:
- Information and communications technology (ICT).
- Emergency lighting.
- Fire alarms and other safety systems.
UPS can be also be useful when the primary power source is shut down intentionally, for example during maintenance, and some systems can correct power supply issues such as voltage spikes.
A UPS is not the same as an auxiliary, standby or emergency power supply as it provides virtually instantaneous supply, avoiding any power interruption.
Generally this will include the use of batteries, supercapacitors, or flywheels (rotary UPS) that either allow equipment to be powered down safely when the mains supply is interrupted, or provide power for long enough for an auxiliary supply to come online. This may only take a few minutes.
Auxiliary power might be provided by:
- Simple packaged battery units that can be incorporated into equipment such as comms cabinets.
- Stand-alone battery units.
- Standby generators.
They might be very small units that supply a single computer, to large installations that supply a major industrial process.
UPS systems will generally include some form of automatic mains failure detection (AMF) and an automated changeover process. They may also detect power restoration and automatically revert to the mains supply.
If continued power supply is critical, the UPS may be provided by a number of smaller packaged units, rather than by a single source, which might introduce a potential source of failure itself. The packaged units might include some ‘redundancy’ so that if one or more of the units fail, there is still adequate supply.
UPS require careful design, particularly where they are supplying critical systems. Regular maintenance is necessary to ensure continued performance.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Comments