Underreaming
Underreaming is a process used to widen the foot of a bored hole or foundation pier so as to increase its loadbearing area.
It is generally undertaken for safety and/or efficiency reasons, or because of restrictions in the ground, that prevent the use of a pier or pile that is wider along its entire length, and is most common on offshore drilling operations, exploration wells, extended reach drilling, and so on.
Underreaming may also be carried out to create tension piles, where the widened foot resists uplift forces that might otherwise cause the pile to be extracted from the ground. For more information see: Tension pile.
It can also be used in the formation of ground anchors.
Typically, the process involves a drill pipe with cutter blades that can be forced open by pumping a fluid into the pipe. The underreaming tool is kept open by the drilling weight and hydraulics from the pump pressure. The pumps are disengaged when the desired depth has been reached. The underreamer closes and is pulled out of the hole.
It may be necessary to use water flushing systems to remove the reamed spoil from the hole and grout to maintain the integrity of the underream.
There is the risk that if the underreamer is left in the hole for too long, the amount of material left in the hole increases. Also, if penetration rates are too high, this can result in a corkscrewed, under-gauged hole.
It is possible to drill a pilot hole and then underream, or to drill and underream as part of the the same drilling operation.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.