Seeding and turfing
Seeding and turfing are two techniques for creating a grass lawn, which is a common feature in a garden. Both techniques require a considerable amount of care and attention.
Generally, turfing is considered to be the easiest and fastest-to-complete option. It requires less work in terms of ground preparation and the turf is provided in rolls that can be cut according to the shape required. However, there will have to be a suitably level and firm surface before the turf is laid. Roots will grow into the soil within two weeks and the resulting lawn can be useable within three weeks.
Other advantages of turfing include that in heavy rain it will not wash off sloped ground as seed might, it is less prone to attack by birds, there is less watering required, and turf can be laid at any time of the year. The disadvantages are that it can be expensive for large areas and it requires fast laying once it has been delivered.
Seeding a lawn is more difficult and preparing the ground is more time-consuming. Seeding involves the removal of stones down to a maximum diameter of no larger than 1 cm, whereas turfing can leave stones of up to 3-4 cm in diameter.
It can take 3-4 months to grow into a useable lawn from seed, and this can be longer depending on the weather conditions. It also requires more aftercare during the first month than turf.
The advantages of seeding are that it is less expensive and time-consuming than turfing, and it is generally the most suitable option for small areas of ground or for repairing lawns. It is also more durable and can be easily reseeded as required.
NB Short Guide, Lime Mortars in Traditional Buildings, published on 1 March 2013 by Historic Scotland, defines seeding as: ‘The nucleation of lime crystals on the surface of particles (usually of the same composition). Seeding particles can act like a catalyst, speeding up the carbonation of lime mortars.’
[edit] Related articles on Designing Buildings
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.