Preston Barracks, Brighton
In February 2018, Brighton and Hove Council sold its derelict Preston Barracks site to the developer U+I Group; clearing the way for a significant mixed-use regeneration project. U+I simultaneously exchanged contracts to partner with Scape Student Living to deliver 534 student beds.
The scheme is part of a wider regeneration initiative to transform an area of Brighton, establish the University at the centre of Brighton’s economic life, attract enterprising and high-growth companies, and attract international investment.
Designed by award-winning architects HASSELL, Studio Egret West, TP Bennett and Stride Treglown, the proposals for the 2.2 hectare plot include the development of the Preston Barracks site (which has been derelict for more than 20 years), the University’s Moulsecoomb campus and adjoining University land comprising:
- 369 new homes.
- 1,338 student beds.
- New academic buildings.
- 25,000 sq. ft. of retail space.
- A 55,000 sq. ft. commercial building for start-ups and SMEs in high-tech manufacturing.
The project was granted planning permission in September 2017. It is hoped that the £300 million public private partnership project will create more than 1,500 jobs, and attract more than £500 million into the city over the next ten years.
Richard Upton, Deputy Chief Executive of U+I, said:
"The Preston Barracks project is one of the largest and most ambitious regeneration projects to have been brought forward in Brighton for a number of years. We will deliver world class, imaginative urban design, leaving a lasting legacy that befits such an inspirational city".
In May 2018, it was confirmed that John Graham had been appointed main contractor for the first phase of the construction works.
Graham's contract is for a seven-storey concrete-framed workspace building, targeting a BREEAM 'excellent' rating. The Central Research Laboratory will be used as a workspace aimed at small businesses and start-up companies. It is expected to be completed by the end of 2019.
U+I development manager Sarah Chitty said: “We’re proud to be working with Graham on the first phase of the project. Their commitment to supporting local communities and economies is closely aligned to our own vision to create long lasting benefits for the places in which we work.”
Graham development director Rob Joyce said: “Our main objective is to create a high-quality commercial building that will attract enterprising, high-growth companies to the area. We will work closely with U+I and the project team to ensure that it provides a range of functioning spaces that are tailored to the needs of the individuals using it, while fostering entrepreneurship and excellence in innovation.”
--U and I
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki:
- Articles by U and I.
- Blackhorse Road regeneration.
- Cathedral Group.
- Circus Street, Brighton.
- Clapham One.
- Development Securities.
- Maidstone development.
- Mixed-use development.
- Placemaking.
- Public private partnership.
- Regeneration.
- The Deptford Project.
- The Movement, Greenwich.
- U and I.
- UandI Think event with John McDonnell MP.
[edit] External references
- U+I - Preston Barracks
Featured articles and news
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Internally insulating a historical building
An experimental DIY approach using mineral thermal lime plaster.
Tree species selection for green infrastructure: A guide for specifiers.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.
Comments