BSRIA launches Offsite Construction for Building Services topic guide
Contents |
[edit] Introduction
BSRIA has launched a free-to-download topic guide entitled ‘Offsite Construction for Building Services’. The ‘at a glance publication’ aims to give readers a glimpse of the subject and suggests further reading.
Offsite construction, sometimes also referred to as ‘offsite manufacture’, ‘pre-fabrication’ or ‘modular construction’, is a general term for making parts of a building away from the construction site, in a purpose-built facility, before transporting them and installing them in their final location. It has the potential to make things on site much easier.
Mechanical and electrical systems
Installing several mechanical and electrical systems on a ‘live’ construction site can be challenging, with limited space, health and safety considerations. And often to a demanding schedule.
The guide highlights offsite construction for services distribution, namely: vertical services risers; larger assemblies; horizontal distribution; offsite construction for packaged rooms – and inside or outside? Also included is whether offsite construction is right for the project in hand.
[edit] Author comments
The guide’s author, John Sands, Principal Consultant, BSRIA, said:
“As with any technology or process, the use of offsite construction needs to be considered carefully to get the best from it. Working in a controlled, purpose-made environment can increase productivity, with no distractions from other construction site activities or issues.
“Time spent on site is also reduced as assemblies arrive ready to be put in place, together with reduced downtime in the factory where work isn’t affected by other events on the construction site.
“The controlled environment enables quality to be improved – the right conditions can be provided for the task and quality control procedures followed – rather than the general conditions of the construction site.
“But it is worth remembering, that flexibility can be reduced as it is harder to accommodate changes that occur on site if the assemblies are being made in the factory – especially at short notice.”
[edit] A few watchpoints
- Consider early on if offsite construction techniques are to be used on the project.
- When considering offsite construction, make sure that the designers know – it may affect the design solutions that are put forward.
- There are different scales of offsite construction, from widespread services distribution to local applications such as packaged plant rooms, see what suits the project.
TG 17/2019 'Offsite Construction for Building Services' is free to download from the BSRIA website: BSRIA topic guides.
--BSRIA
[edit] Related articles on Designing Buildings Wiki
- Design for deconstruction.
- Design for Manufacture and Assembly (DfMA).
- Drainage.
- Fabricated drainage stacks.
- Flying factory.
- Housing Defects Act 1984.
- Kit house.
- Modern methods of construction.
- Modular buildings.
- Off site materials.
- Off site, on track.
- Off-site construction.
- Offsite manufacturing.
- Off-site prefabrication of buildings: A guide to connection choices.
- On site storage solutions.
- On-site Productivity Issues
- Plug and play skyscrapers.
- Prefabricated structural panels.
- Prefabrication.
- Secondary Ventilation Stacks in Tall Buildings.
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Comments