System operator
The Energy White Paper, Powering our Net Zero Future (CP 337), published in December 2020 by HM Government, suggests that system operators: ‘Manage the whole energy system and keep it in balance so that gas and electricity are available when needed.’
Planning our electric future: a White Paper for secure, affordable and low-carbon electricity, Glossary, published by the Department of Energy & Climate Change on 14 July 2011, defines the System Operator (SO) as: ‘…responsible for ensuring the electricity system remains balanced within each half hour period. Generators may generate more or less energy than they have sold; customers of suppliers may consume more or less energy than the supplier has purchased. The SO must ensure that imbalances in supply and demand are addressed on a second by second basis, within the constraints of the network.’
[edit] Related articles on Designing Buildings
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.