Fees are generally payments to consultants to cover work they have undertaken for clients under the terms of an agreement. They are generally paid in instalments, either on regular dates or at pre-agreed stages of completed work.
Structural engineers fees may be calcuated based on time charges, as a fixed lump sum or as a percentage of the overall project cost. Fees are entirely dependent on the nature of the project and the circumstances of the appointment. Large new-build projects may attract lower percentage fees than small works to existing buildings (see table below), commercial work may attract lower fees than private residential work, and works to historic or listed buildings may attract higher fees.
The examples given below are indicative only and apply mainly to small projects. Fee calculation may be based on:
- Charging a lump sum, particularly for small projects (eg £1,000 for a standard domestic extension, plus extra for structural details or special foundations; or £750 for a loft conversion inclusive of calculations and structural details);
- Flat-rate fees: site visits (eg starting at £150 per visit); design of steel beams and bearing details (eg, £75 for a single beam and £50 for each beam thereafter); masonry check (eg £100); goal-post frame (eg £200 - £300); and steel connections (eg £50 per connection).
- Hourly or daily rates (eg £80-£100/hour; £400-£500 per half day, etc);
- A percentage of the project’s total cost (see table below).
The fee percentage will depend on the size of the project (in project cost terms). The following table gives the fees a structural engineer might charge (at 2013 prices) for work undertaken on commercial office developments in London of varying costs.
Construction cost (excl. contingencies and VAT) | Under £1.5m | £1.5m - £3m | £3m - £10m | £10m - £25m | £25m –£50m | £50m+ |
Struct'al engineer % and actual fee |
2% £30k max |
2% £30k – £60k |
1.8% £54k– £180k |
1.5% £150k – £375k |
1% £250k – £500k |
1% £500k+ |
Other things that might affect the fees charged include:
- Type and complexity of project (eg hospital v industrial shed);
- Scope of services. For example, full design and site inspection will attract a higher fee than a preliminary design that is then developed by the contractor;
- Anticipated repeat and/or bespoke elements of the design;
- Location of site and other consultant practices;
- Reputation of practice. For example, an accomplished engineering firm may charge more than one that is newly qualified;
- Client organisation and track record. This may affect how much support is required and the risk perceived by the engineers;
- Conditions of engagement. For example, the requirement for collateral warranties and partnering arrangements;
- Anticipated programme and resources required.
- Economic climate. Fees may be lower during recessions and higher during booms;
- Consultant workload, and
- Assessment of the competencies of other consultants.
When agreeing fees, it is important to be clear exactly what services are being provided, for example, do the fees include travel, printing costs, outline and detailed planning applications and so on. For more information see: Scope of services.
Professional institutes used to publish recommended fee scales expressed as a percentage of construction costs for a range of different building types. However, legislation aimed at preventing anti-competitive behaviour forced the institutes to abolish these scales, leaving little guidance for clients about what is normal.
Consequently, bidding for consultancy work has become a free-for-all in a highly competitive market. Some commentators argue that this has driven down fees, however, it may also have driven down standards and led to much design work being transferred from consultants to specialist contractors and suppliers who include design costs in their building agreements.
It is important therefore to obtain several quotes for fees, to be clear what is being provided and to be wary of just assuming the lowest quote provides the best value.
[edit] Related articles on Designing Buildings Wiki
- Appointing consultants.
- Architects fees.
- Base date.
- Charge-out rate.
- Compensation.
- Consideration.
- Construction organisations and strategy.
- Consultant team.
- Contractual obligation.
- Design team.
- Disbursement.
- Hourly rate.
- Invoice.
- Letter of appointment.
- Planning fees.
- Quantity surveyor’s fees.
- Rates.
- Schedule of services.
- Scope of services.
- Sub-consultant.
- Winning work.
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Comments
It would be nice if you could update the table to show a more realistic (current for 2021) percentage of fee.
These numbers are quite a way off what the market is currently.
This is a WIki site - if you have better information, please click 'Edit this article' and add it.