Carbide meter
When identifying damp in buildings, architects, surveyors etc may use moisture meters to confirm or obtain a diagnosis. In skilled hands with regular site calibration, moisture meters can be a good starting point.
Carbide meters are one method of measuring moisture content. This technique (sometimes referred to as Speedy Carbide Test after the manufacturer’s name) works by testing a weighed sample of drilled mansory that has been taken from a sample area such as a mortar joint located above the damp proof course. This sample is then placed in a container. A measured amount of calcium carbide powder is placed in a separate portion of the container, and then the container is sealed. The container is shaken and the two substances mix together to trigger a reaction that produces acetylene gas if moisture is present.
The meter will indicate the results of the test. Readings will range from 0 to 5, with a higher number indicating a higher level of moisture.
Carbide meters are likely to give a more accurate measure of moisture content than some other techniques, although they require the removal of a sample - which could be considered by some as destructive. As a result, this method of testing may only be advisable after an electronic meter, or some other method has indicated the presence of moisture.
For more information see: Assessing moisture in porous building materials.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.