Specialist contractors start-up meeting
A formal start-up meeting with specialist contractors is an opportunity to:
- Issue appropriate project documentation.
- Agree lines of communication.
- Agree change control procedures.
- Co-ordinate the interface between specialist contractors and the consultant team and agree approval and payment procedures (generally specialist contractor design will be approved and certified by the member of the consultant team with primary responsibility for the that area of the design).
- Agree collaborative practices such as document control, the use of a common data environment, CAD, building information modelling and so on (see collaborative practices for more information).
- Agree meeting schedules.
- Discuss the programme.
- Review design risk management.
- Review design co-ordination and integration procedures.
NB. A design co-ordinator might be appointed within the consultant team to ensure proper integration and co-ordination of specialist contractors designs into the overall design.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.
Minister quizzed, as responsibility transfers to MHCLG and BSR publishes new building control guidance.
UK environmental regulations reform 2025
Amid wider new approaches to ensure regulators and regulation support growth.
BSRIA Statutory Compliance Inspection Checklist
BG80/2025 now significantly updated to include requirements related to important changes in legislation.