Right of support
Where properties adjoin, there may be a mutual right of support for both land and buildings. This can apply to buildings that are joined, buildings that rely on the support of adjacent land, and to the land itself. This means that if works are carried out to land, buildings, retaining walls, excavations and so on, or if structures are demolished, the right of support of adjoining properties must be maintained.
Support may be ‘subjacent’ (from below) or ‘adjacent’ (from the neighbouring property).
The right to support arises naturally for land and this right cannot be removed. If support is withdrawn, resulting subsidence, damages may be sought. However, this natural right does not apply to buildings.
Where one party places an additional burden on the land, for example by building on it, there is no natural right of support, but one can be acquired:
- Where it is expressly granted. For example it may be set out in a conveyance deed or a transfer deed.
- Where it is impliedly granted or reserved. For example if properties are separated and the right was intended or mutual.
- By prescription. Where the additional burden has existed for 20 years or more.
The acquisition of this 'easement' (a right which a person has over land owned by someone else) cannot be prevented.
The Party Wall etc. Act establishes a procedure for carrying out work to walls, boundary walls, party structures (such as floors) and excavations within 3 or 6 metres of a neighbouring building or structure (depending on the depth of the hole or of the proposed foundations). The Act requires that anyone carrying out such works must give notice of their intentions to adjoining owners and sets out procedures in the event that the adjoining owner does not agree to the proposed works. See Party Wall Act for more information.
[edit] Related articles on Designing Buildings Wiki
- Adjoining owner.
- Basement.
- Basement excavation.
- Basement v cellar.
- Construction covered by the Party Wall Act of 1996.
- Derogation from grant.
- Easements
- Encumbrances.
- Land register.
- Party structure notice.
- Party wall act.
- Party wall surveyor.
- Quiet enjoyment.
- Responsibility for boundary features.
- Restrictive covenants.
- Right to light.
- Right to a view.
- Rights of way.
- Substructure.
- Tree rights.
- Trespass.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.