Project architect
Some construction projects may involve two sets of architectural practices (or more than one architect from the same practice).
The ‘design architect’ (sometimes referred to as a ‘concept architect’) will have been charged with carrying out the creative design, i.e responsible for devising the architecture in terms of planning the building, its spaces and overall appearance, as well as its relationship with its environment. This will include plans, elevations, computer generated images (CGIs) and other concept drawings that may have formed part of the successful planning application.
The project architect (sometimes called a ‘job architect’) develops these broad-brush designs into a detailed design, ensuring the building is fully buildable from a technical perspective in accordance with the concept architect’s vision (and that of the client).
The project architect’s function might include:
- Undertaking site surveys.
- Creating a set of construction (or ‘working’) drawings for the contractor and local authority which satisfy building regulations in terms of constructability, thermal, fire, acoustic and public health criteria and so on. This includes detailed plans, sections, elevations, floor/wall/roof construction and other drawings that allow construction of the building.
- Writing the specification to complement the drawings; this will include requirements for materials, site procedures and construction technique and so on.
- Liaising with the local authority/building control officer before, during and after construction has been completed.
- Coordinating input from the client, contractor and other outside consultants such as the structural engineer, quantity surveyor, services engineer, landscape architect, acoustic consultant, local authority and others.
- Maintaining quality control by visiting the site during construction or ensuring there is a continual on-site presence if warranted by the project.
- Compiling a list of minor defects or omissions at completion (‘snagging’) for the contractor to rectify.
- Contract administration.
The project architect will typically be qualified to RIBA Part 3 and must be registered with the Architects’ Registration Board (ARB). Depending on the size of the practice, the project architect may employ a team of supporting architects, in-house architectural technicians (technologists), interns, model-makers and other professionals to progress the design.
[edit] Related articles on Designing Buildings Wiki
- Appointing an architect.
- Appointing consultants for building design and construction.
- Architect's Registration Board.
- Architectural assistant.
- Architectural styles.
- Architectural technologist.
- Architectural technician.
- Architect's fees.
- Architectural training.
- Concept architectural design.
- Consultant team.
- Design coordination.
- Design liability.
- Design methodology.
- How to become an architect.
- Introducing architectural technology to India.
- Lead consultant.
- Lead designer.
- Practice management.
- RIBA.
- Scope of services.
- The Architects Act.
- The role of architects.
- Year-out student.
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.