If serious problems occur on site, immediate actions undertaken by an architect might include:
- Stop the work
- Ensure that the contractor has notified the employer
- Ensure that the contractor does not repair/do any work until the insurers/survey have/is carried out their investigation
- Notify the CDM co-ordinator
- Instruct the structural engineer to carry out a structural report
- Assess measures to be taken to restore the site to a safe condition
- Ask the quantity surveyor to go to site and value the damages
- Ensure that the contractor has disclosed all of the facts to the insurer
Contractual situation 1: Example - collapsed wall
- A full investigation must be carried out to determine who’s fault it was (eg design fault / contractors fault / specified peril such as a flood)
- Contact professional indemnity insurer to notify them of a circumstance that may lead to a claim
- Advise other consultants to do the same
- If the damage was caused by a specified peril, it will be covered by works insurance
- If it was a design fault, will be covered by PI insurance
Contractual situation 2: example - a fire
- The contractor will restore the damaged work, restore and repair any site materials damaged and proceed with carrying out the completion of the works
- The restoration of the loss or damage shall be treated as if it were a variation required by an architects instruction
- The contractor may be entitled to an extension of time and loss and/or expense
Contractual situation 3: example - archaeological items found
- All items found on site are the property of the employer
- The architect should contact the archaeology department of the borough or county council to inform them of the discovery and ask for advise.
- The architect shall issue instruction as to what is to be done, which may require that the contractor permit the examination, excavation and removal of the items by a third party
- The architect shall ascertain any entitlement the contractor has to loss and/or expense
[edit] Related articles on Designing Buildings Wiki
- Code of construction practice.
- Complaining about construction sites.
- Considerate Constructors Scheme.
- Damage caused by construction works.
- Environmental health.
- Environmental impact assessment.
- Health and safety inspector.
- Noise nuisance.
- Nuisance in construction.
- Quiet period.
- Site inspections.
- Site rules.
- What hours are construction sites allowed to operate?
Featured articles and news
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.