Planned preventative maintenance
Maintenance is an essential to ensure that buildings and other built assets present a good appearance and operate at optimum efficiency. Apart from decay and degradation of the building itself, inadequate maintenance can reduce performance, affect health and threaten the safety of occupants and those in the vicinity.
Maintenance can help:
- Prevent the process of decay and degradation.
- Maintain structural stability and safety.
- Prevent unnecessary damage from the weather or from general usage.
- Optimise performance.
- Help inform plans for renovation, refurbishment, retrofitting or new buildings.
- Determine the causes of defects and so help prevent re-occurrence or repetition.
- Ensure continued compliance with statutory requirements.
Very broadly, maintenance can be:
- Condition-based, 'corrective' maintenance. Reactive maintenance undertaken to repair something that has broken
- Planned preventive maintenance (PPM) which is scheduled and can prevent damage from occurring, helping to avoid breakdowns and down-time.
PPM has the advantage of enabling more proactive approach to maintenance, and helps prevent small issues from becoming larger issues at a later date, with the knock-on negative impact on productivity. This also means that costs are distributed more evenly.
Planned preventive maintenance may be scheduled on a PPM calendar which incorporates manufacturer’s suggested maintenance schedules for individual items based on dates, equipment running hours, distance travelled, and so on.
For small sites with fewer items to maintain, a spreadsheet may be sufficient as a PPM calendar. Various software packages are available for larger sites.
A PPM calendar provides a single interface for all maintenance, making it easier to track and manage maintenance. It can also generate reminders or alerts when a maintenance event is due. The calendar should be capable of providing a variety of scheduling options, i.e. after a set number of usage hours, a set number of weeks, etc. This allows the maintenance plan to be customised according to the needs of different items.
A calendar can also be used to manage the inventory of spare parts and supplies, enabling the re-ordering as and when necessary to avoid unnecessary delays.
NB. NRM3: Order of cost estimating and cost planning for building maintenance works defines preventative maintenance as: '...the planned and controlled programme of maintenance and inspection carried out at predetermined intervals (or corresponding to prescribed criteria) and intended to reduce the probability of failure or degradation of the functioning of an item. This includes inspections, adjustments, cleaning, lubrication and/or selective replacement of components (e.g. filters) and minor repairs, as well as performance testing and analysis intended to maximise the reliability, performance and life cycle of building systems, equipment, etc. Preventive maintenance consists of many checkpoint activities on items that, if disabled, may interfere with an essential installation operation, endanger life or property, or involve high costs or long lead times for replacement.'
Business-Focused Maintenance (BG 53/2016), written by Jo Harris and published by BSRIA in May 2016, defines Planned preventative maintenance (PPM) as: ‘…the implementation of a strategy to maximise the operational life of assets and reduce unforeseen instances of failure. PPM should form part of any asset management plan implemented to minimise interruption to core business functions. PPM tasks are based on the use of regular inspections, checks, measurements and fault finding tasks at frequencies that are grounded on experience and based on the expected deterioration of the asset. The purpose of these tasks is to monitor condition, diagnose signs of failure and instigate more intrusive maintenance to prevent complete failure. The outcome of a system of generic maintenance tasks and schedules provides a level of plant reliability which is independent of the service levels required by the business.’
[edit] Related articles on Designing Buildings
- Building owner's manual.
- Business focused maintenance.
- Construction inventory management.
- Facilities management.
- In-house or outsource maintenance.
- Maintenance.
- Maintenance Repair Operations MRO.
- Maximising maintenance budgets after lockdown.
- Predictive maintenance.
- Proactive maintenance.
- Resource management.
- Reliability centred maintenance.
- Unplanned maintenance.
- Scheduled maintenance.
- Soft landings.
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.