Pressure equalized rainscreen systems
Pressure equalized rainscreen (PER) systems are a design that aims to achieve equal pressure on the exterior of a cladding system and to the interior air cavity beneath it, thus no pressure gains or losses mean no route for rain to enter the system. The concept of pressure equalization has been proven in many applications and continues to be widely used throughout the industry. Generally tested in the US to AAMA 508 standards, in the UK fire class tests will likely be according to Euroclass A1 or A2, A or B as the lower rating.
The Centre for Window and Cladding Technology (CWCT) defines a rainscreen cladding system as '...a wall comprising an outer skin of panels and an airtight insulated backing wall separated by a ventilated cavity. Some water may penetrate into the cavity but the rainscreen is intended to provide protection from direct rain'.
The Metal Constuction Association, Technical Bulletin MCM Panel System Definitions, dated March 2018 describes the design and functions of MCM Pressure equalized rainscreen (PER) systems as thus:
"Equalization is achieved by venting the interior airspace in precisely the correct locations and amounts. This venting allows air to quickly pass through the cladding joinery allowing the interior air space to quickly equalize with the exterior pressure while controlling water infiltration. However, this pressure equalization also means that the solid backing (such as gypsum board) must be properly designed and constructed behind the panel system. The air/water barrier becomes the primary air barrier for the building. In addition to the air/water barrier, the interior air space behind the panel system is typically divided into sealed and separate compartments. This prevents the air within the air space from migrating between higher and lower pressure zones. One method to create movement of air in differing pressure zones is the use of vertical and/or horizontal sealant as shown in Figure 6, however the design of adequate compartmentalization is beyond the scope of AAMA 508. When properly designed and installed, acceptable levels of pressure equalization can be proven in laboratory test results to nationally recognized standards."
[edit] Related articles on Designing Buildings
- Building fabric.
- Cladding.
- Composites.
- Copper.
- Crinkly tin.
- Curtain wall systems.
- Drained and back ventilated rainscreen systems.
- Dry Seals for metal composite material systems.
- Glazing.
- Metal.
- Metal composite material panel systems MCM and MCP.
- Metal profile cladding.
- Metal roofing.
- Modernising composite materials regulations.
- Rainscreen.
- Sandwich panel.
- Shingle roofing.
- Wall types.
- Weatherboarding.
- Wet Seals for metal composite material systems.
- Zinc
Featured articles and news
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building photo contest 2024 winners
Fresco School by Roman Robroek and Once Upon a Pass by Liam Man.