Pre-tender interview
When selecting suppliers to design, construct and perhaps operate a development, an initial short-list of prospective tenders may be invited to attend pre-tender interviews before they are invited to tender.
A pre-tender interview is an opportunity to:
- Assess the tenderers understanding of the commission.
- Assess the tenderers likely approach to the project.
- Assess the tenderers current workload.
- Assess the tenderers enthusiasm.
- Clarify ambiguities on either side.
- Verify that the proposed timescale for the tender process is achievable.
- Verify that the proposed nature of the tender process will obtain the best results.
Price does not feature in the pre-tender interviews as tender documents have yet to be issued.
Discussions held during the interviews may result in changes being made to the tender documents or to the length of the tender period. It can be in the interest of the client to make these changes as it ensures that they get the best value and most accurate tenders possible.
Interviews may include presentations by prospective tenderers, followed by questions from a small panel. The panel should agree in advance the nature of questions to be asked of each consultant (perhaps based on an assessment of their pre-qualification questionnaires). Answers may be scored and weighted, and sufficient time allowed between interviews for scores to be compiled and considered. This allows an objective appraisal to take place and also allows a consensus opinion to be formed, rather than having decisions driven by a single person.
Pre-tender interviews should be carefully managed so that tenderers are not made aware of who the other tenderers are, as this may impact on the competitiveness of the tenders they submit. This may include arrangements in relation to timing, car parking, waiting rooms and signing in books as well as the removal of any materials left by at the interviews by tenderers.
If the pre-tender interviews reveal that one or more prospective candidates are unsuitable, the initial shortlist may be reduced and the remaining candidates invited to tender.
It may also be appropriate to hold mid-tender interviews.
[edit] Related articles on Designing Buildings Wiki
- Best value.
- Construction contract.
- Contract documents.
- How to prepare tender documents.
- Mid-tender interviews.
- Pre-qualification questionnaire.
- Procurement route.
- Tender.
- Tender documents
- Tender negotiations.
- Tender settlement meeting.
[edit] External references
- PACE Guidance on the Appointment of Contractors and Consultants p 481 (for contractors) and p303 (for consultants).
- OGC Tendering process for consultancy support.
Featured articles and news
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.