Post project review of construction projects
A post project review may begin during the defects liability period, when the client first occupies the development (now called the 'rectification period' in Joint Contracts Tribunal (JCT) contracts).
A post project review is undertaken to evaluate the effectiveness and efficiency of the project delivery process. To undertake a post project review, it is important to seek the views of contractors, designers, suppliers and the client about how well the project was managed.
This may include assessments of how well the delivery of the project performed against key performance indicators such as:
- The quality of briefing documents.
- The effectiveness of communications.
- The performance of the entire project team.
- Quality issues.
- Health and safety issues.
- Certification.
- Variations.
- Claims and disputes.
- Collaborative practices.
An evaluation can then be made of what lessons can be learned from the approach taken and a lessons learned report prepared.
A wider 'post occupancy evaluation' may comprise two studies:
- A post project review to evaluate the project delivery process.
- An assessment of performance in use, to assess the extent to which business and design objectives have been satisfied, which may not begin until 6 to 12 months after occupation, as operations may not be properly established before then.
See Post occupancy evaluation and Performance in use for more information.
NB When the development is first occupied by the client, it is important to visit the site immediately to identify any issues that need to be addressed quickly. It can be beneficial to establish a help-desk and rapid response team to resolve issues as they arise (See articles on occupation and migration strategy).
[edit] Related articles on Designing Buildings Wiki
- BREEAM.
- Building performance metrics.
- Defects liability period.
- End of contract report.
- Energy performance certificates.
- Extended aftercare.
- Initial aftercare.
- OGC Gateway Review 5: Operations review & benefits realisation (or benefits evaluation)
- Migration strategy.
- Performance in use.
- Performance of exemplar buildings in use: Bridging the performance gap FB 78.
- Post occupancy evaluation (repeats some of the text in this article).
- Post opening project evaluation.
- Soft landings.
- Value added.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February