Post project review of construction projects
A post project review may begin during the defects liability period, when the client first occupies the development (now called the 'rectification period' in Joint Contracts Tribunal (JCT) contracts).
A post project review is undertaken to evaluate the effectiveness and efficiency of the project delivery process. To undertake a post project review, it is important to seek the views of contractors, designers, suppliers and the client about how well the project was managed.
This may include assessments of how well the delivery of the project performed against key performance indicators such as:
- The quality of briefing documents.
- The effectiveness of communications.
- The performance of the entire project team.
- Quality issues.
- Health and safety issues.
- Certification.
- Variations.
- Claims and disputes.
- Collaborative practices.
An evaluation can then be made of what lessons can be learned from the approach taken and a lessons learned report prepared.
A wider 'post occupancy evaluation' may comprise two studies:
- A post project review to evaluate the project delivery process.
- An assessment of performance in use, to assess the extent to which business and design objectives have been satisfied, which may not begin until 6 to 12 months after occupation, as operations may not be properly established before then.
See Post occupancy evaluation and Performance in use for more information.
NB When the development is first occupied by the client, it is important to visit the site immediately to identify any issues that need to be addressed quickly. It can be beneficial to establish a help-desk and rapid response team to resolve issues as they arise (See articles on occupation and migration strategy).
[edit] Related articles on Designing Buildings Wiki
- BREEAM.
- Building performance metrics.
- Defects liability period.
- End of contract report.
- Energy performance certificates.
- Extended aftercare.
- Initial aftercare.
- OGC Gateway Review 5: Operations review & benefits realisation (or benefits evaluation)
- Migration strategy.
- Performance in use.
- Performance of exemplar buildings in use: Bridging the performance gap FB 78.
- Post occupancy evaluation (repeats some of the text in this article).
- Post opening project evaluation.
- Soft landings.
- Value added.
Featured articles and news
A briefing on fall protection systems for designers
A legal requirement and an ethical must.
CIOB Ireland launches manifesto for 2024 General Election
A vision for a sustainable, high-quality built environment that benefits all members of society.
Local leaders gain new powers to support local high streets
High Street Rental Auctions to be introduced from December.
Infrastructure sector posts second gain for October
With a boost for housebuilder and commercial developer contract awards.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
COP29; impacts of construction and updates
Amid criticism, open letters and calls for reform.
The properties of conservation rooflights
Things to consider when choosing the right product.
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.
Embodied Carbon in the Built Environment
Overview, regulations, detail calculations and much more.
Why the construction sector must embrace workplace mental health support
Let’s talk; more importantly now, than ever.
Ensuring the trustworthiness of AI systems
A key growth area, including impacts for construction.