Plan, Do, Check, Act (PDCA)
Plan, Do, Check, Act (PDCA) is a model that is used to assist the control and continual improvement of processes and projects. It has been used in construction project management as a means of balancing the systems and behavioural aspects of management and health and safety. Its cyclic approach allows for the constant updating of health and safety measure ultimately leading to a safer working environment.
PDCA was popularised by W. Edwards Deming, a leading figure in modern quality control processes and procedures. Deming intended that PDCA should be used when developing a new or improved process, product or service; when implementing changes; when defining a repetitive work process, and so on.
It is made up of the following stages:
- Plan: Assess a current or new process and how improvements could be made.
- Do: Test small changes as part of a limited study to assess their effectiveness.
- Check: Gather and analyse the test results, compare them with the expected outcomes and identify what has been learnt.
- Act: Take action according to the lesson learned in the ‘Check’ step.
In some iterations of PDCA, the fourth step ‘Act’ is replaced with ‘Adjust’. This is often used when the PDCA process has been run several times and enough information has been accumulated for it to have been adopted as a new ‘standard’. ‘Adjust’ allows for continual monitoring of the process after changes have been made, with small improvements as and when appropriate, creating a cycle of continuous improvement.
[edit] Related articles on Designing Buildings
- Assurance and self-certification.
- CDM Regulations: a quality perspective.
- Contingency theory.
- Continuous improvement process.
- Design freeze: a quality perspective.
- Digital engineering.
- Game theory.
- Lean construction.
- Lean Six Sigma.
- Pareto analysis.
- Project execution plan.
- Project manager.
- Quality control.
- Quality Management System.
- Total quality management in construction.
- Transition time.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
Comments
This doesn't seem have been developed for practical application in a construction environment.