Photochemical ozone creation potential
The Photochemical Ozone Creation Potential (POCP) scale quantifies the relative abilities of volatile organic compounds (VOCs) to produce ground level ozone.
Ozone can be formed when chemical reactions between oxides of nitrogen (NOX ) and Volatile Organic Compounds (VOC), also known as Hydrocarbons are caused either near the ground or in the atmosphere by heat and sunlight.
POCP is an environmental impact indicator of EN 15804:2012+A2:2019/AC:2021, which is used as guidance in the generation of the lifecycle assessment (LCA) methodology used to create product environmental footprints (PEF). It is also one of the environmental performance indicators for the calculation, assessment and generation of environmental product declarations (EPDs).
In the same way that the global warming potential (GWP) of different pollutants are converted to ratios CO2 equivalent figures, POCP values are usually calculated to a non-methane volatile organic compounds (NMVOCs) equivalent figure, using atmospheric boundary layer models containing detailed representations of atmospheric VOC degradation chemistry.
Examples, unspecified emissions to air, unspecified location:
- 1 kg nitrogen oxides = 1 kg NMVOC eq.
- 1 kg carbon monoxide (fossil) = 0.0456 kg NMVOC eq.
- 1 kg acetic acid = 0.164 kg NMVOC eq.
(refs, LOTOS-EUROS as applied in ReCiPe, EN 15804. Version: August 2021, Van Zelm et al. 2008, ReCiPe 2008)
[edit] Related articles on Designing Buildings
Featured articles and news
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.