Approved document N
The Building Regulations establish standards that must be achieved in the construction of buildings.
The 'Approved Documents' provide guidance for how the Building Regulations can be satisfied in common building situations. They are given legal status by the Building Act 1984. There is no obligation to adopt the solutions presented in the Approved Documents, the Building Regulations can be satisfied in other ways.
The Building Regulations Part N: Glazing - Safety in relation to impact, opening and cleaning, laid down the requirements for the use of safety glazing to avoid impact hazard and for the suitable awareness and definition of glazed areas. It also included are safety requirements relating to the use and cleaning of windows.
Part N and its associated Approved Document N were withdrawn from use in England on 6 April 2013, with their requirements and guidance subsumed into Part K of the Buildings Regulations and Approved Document K: Protection from falling, collision and impact.
An archive version can be found at: https://www.planningportal.co.uk/info/200135/approved_documents/81/part_n_-_glazing_safety_-_withdrawn
Approved document N continues to apply in Wales, and can be found at: https://gov.wales/building-regulations-guidance-part-n-glazing-safety
[edit] Related articles on Designing Buildings
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.