Parge coat
The term ‘parge coat’ refers to the application of a thin coat of a cementitious or polymeric mortar to concrete or masonry walls.
Parging (or sometimes 'pargeting') is commonly used as a method for improving the thermal and acoustic performance of walls before before finishing them with a final surface such as drylining.
A parge coat can reduce air leakage through cracks, joints and porous wall constructions and so reduce energy consumption and improve comfort and acoustic performance. It can also be used to prepare a surface for a topcoat.
The parge coat is typically applied by hand, or by spraying, in a continuous coating with a minimum thickness of 6mm. As the walls are then finished with a subsequent top layer, it is not necessary to smooth the parge coat to a perfectly flat surface.
See also: Pargetting
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
A dynamic brand built for impact stitched into BSRIA’s building fabric.