PA ratio for insulation
U-values are used to measure how effective elements of a buildings fabric are as insulators. That is, how effective they are at preventing heat from transmitting between the inside and the outside of a building. The lower the U-value of an element of a building's fabric, the more slowly heat is able to transmit through it, and so the better it performs as an insulator.
U-values are measured in watts per square metre per degree Kelvin (W/m²K). So for example, if we consider a double glazed window with a U-value of 2.8, for every degree difference in temperature between the inside and outside of the window, 2.8 watts will be transmitted every square meter.
However, the situation for ground floors is more complicated than this.
The ground floor is not generally exposed to the weather, but faces, or sits above the ground. Unlike external conditions, the ground has a relatively constant temperature, typically 8 - 11° C in the UK. As a result, the thermal performance of the ground floor is dependent on the shape of its perimeter and the overall area it covers, as these determine the extent to which the floor is exposed to external conditions.
The smaller the floor and the greater the length of the perimeter exposed to the outside, the poorer its thermal performance and so the more insulation will be required to comply with the building regulations. So a domestic building may need to have the whole of the ground floor insulated, while a larger commercial building may only require insulation at the perimeter of the floor.
The PA ratio (perimeter area ratio, or P/A ratio) is a measure of the degree to which the perimeter of the floor is exposed:
PA = exposed perimeter (m) / floor area (m²).
The lower the PA ratio, the better the thermal performance of the floor.
The floor area is calculated from the internal surfaces of the external walls, and includes all heated spaces, but not unheated spaces that are outside of the insulated body of the building. Exposed perimeters include external perimeters and perimeters that connect to unheated spaces outside of the insulated body of the building.
The PA ratio, in combination with information about the construction of the floor (which will determine its U Value) can be used to calculate the amount and thickness of insulation required to comply with the building regulations.
Some insulation manufacturers provide tables or calculating tools that can be used to determine the amount of insulation required for a given floor type and PA ratio.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Cavity wall insulation.
- Conventions for calculating linear thermal transmittance and temperature factors.
- Computational fluid dynamics.
- Floor insulation.
- Heat transfer.
- Insulation specification.
- Limiting fabric parameters.
- R-value.
- Roof insulation.
- Solid wall insulation.
- Standard Assessment Procedure SAP.
- U value.
- U-value conventions in practice: Worked examples using BR 443.
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.