Ozone depletion potential
Ozone Depletion Potential (ODP) refers to the relative amount of degradation a chemical compound can cause to the ozone layer. It is similar to Global Warming Potential (GWP) though this a measure of how much a given mass of a gas contributes to global warming.
ODP is an environmental impact indicator of EN 15804:2012+A2:2019/AC:2021 which is used as guidance in the generation of the life cycle assessment (LCA) methodology used to create Product Environmental Footprints (PEF). It is also one of the environmental performance indicators for the calculation, assessment and generation of environmental product declarations (EPDs).
ODP as a measure of how much damage a chemical can cause to the ozone layer is compared with a similar mass of trichlorofluoromethane (CFC-11) as a ratio. CFC-11, with an ozone depleting potential of 1.0, is used as the base figure for measuring ozone depleting potential.
Examples for unspecified emissions to air
1 kg halon-1211 = 6.9 kg CFC 11 eq.
1 kg methyl bromide = 0.57 kg CFC 11 eq.
1 kg CFC 11 = 1 kg CFC 11 eq.
(refs, ODP, EN 15804. Version: August 2021, WMO 2014)
[edit] Related articles on Designing Buildings
Featured articles and news
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.