Inclusive design review
The Inclusive Design Overlay to the RIBA Plan of Work published by the RIBA in 2023, states: ‘An inclusive design review, also referred to as an appraisal, is a desktop review of floor plans, drawings, details and specifications often captured as marked-up drawings with comments. An inclusive design review is undertaken by the Inclusive Design Lead in order to identify any inclusion and access barriers and highlight opportunities for improvement, as designs are being proposed and iterated throughout the RIBA work-stages. This evaluation will be undertaken against the regulations, standards and guidance as set out in the Inclusive Design Strategy. An inclusive design evaluation can be presented in a variety of formats, e.g., as part of the Inclusive Design Stage Outcome Review (end of RIBA Stage report) or presented in a meeting to the relevant teams to discuss the insights.’
[edit] Related articles on Designing Buildings
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February