Inclusive design review
The Inclusive Design Overlay to the RIBA Plan of Work published by the RIBA in 2023, states: ‘An inclusive design review, also referred to as an appraisal, is a desktop review of floor plans, drawings, details and specifications often captured as marked-up drawings with comments. An inclusive design review is undertaken by the Inclusive Design Lead in order to identify any inclusion and access barriers and highlight opportunities for improvement, as designs are being proposed and iterated throughout the RIBA work-stages. This evaluation will be undertaken against the regulations, standards and guidance as set out in the Inclusive Design Strategy. An inclusive design evaluation can be presented in a variety of formats, e.g., as part of the Inclusive Design Stage Outcome Review (end of RIBA Stage report) or presented in a meeting to the relevant teams to discuss the insights.’
[edit] Related articles on Designing Buildings
Featured articles and news
HE expands finance alliance to boost SME house building
Project follows on from Habiko public-private place making pension partnership for affordable housing delivery.
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
How orchards can influence planning and development.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.