Standard hatching styles for drawings
Contents |
[edit] Why is hatching used on drawings?
Hatching styles are patterns used on drawings for the easy identification and location of different types of commonly-used materials, objects and spaces.
Hatching can also be used as a form of shading - for example to indicate shadows.
[edit] How is hatching done?
Historically, hatches were drawn by hand, but the development of transfers, and then drawing software enabled considerable time savings on what was a very repetitive and time consuming task. Today, hatch commands can be used to fill a selected area or material with a standard hatching pattern almost instantly. For example, a bathroom can be tile-filled by selecting the relevant hatching style to indicate tiles, and applying it to the whole tiled area of the drawing. The use of parametric software allows common attributes to be attached to a number of similar elements, so that, for example, all tiled areas in a building can be hatched in one command, and changes can be applied throughout.
[edit] Examples of common hatching patterns
Some of the most common hatching styles are set out below. To make this list more comprehensive, click 'Edit this article' at the top of the page and add more.
Aggregate | |
Blockwork wall | |
Blockwork | |
Brickwork | |
English bond wall | |
Garden bond wall | |
Insulation | |
Concrete | |
Finewood | |
Hardwood | |
Plywood | |
Glass | |
Gravel | |
Hardcore | |
Paving | |
Rubble | |
Sand | |
Stone | |
Shingles | |
Roofing tiles | |
Floor tiles |
[edit] Related articles on Designing Buildings
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.
Please add more hatching styles to this article to make it more comprehensive.