30 St. Mary Axe
Contents |
[edit] Introduction
30 St. Mary Axe, widely known as ‘The Gherkin’, is a commercial office building in the heart of the City of London. Since its completion in December 2003, it has become one of the UK’s most distinctive buildings and a symbol of 21st century London.
The building was designed by the architect Norman Foster and Arup Group and was constructed by Skanska.
In 1992, the Provisional IRA exploded a bomb close to the Baltic Exchange which previously stood on the site. The bomb caused substantial damage to the building façade, and despite the intentions of conservation groups such as English Heritage (now Heritage England), the decision was taken to dismantle the building to make way for a new development.
In 1996, Trafalgar House submitted their plans for a Millennium Tower skyscraper, which was abandoned due to concerns about the proposed height of 386 metres being out-of-scale with the City of London at the time.
Foster and Arup then became involved with a new design, and Deputy Prime Minister John Prescott granted planning permission in 2000. Construction began the following year.
[edit] Design and construction
The design has a circular plan, that widens in profile as it rises and then tapers towards the top, giving it the distinctive ‘gherkin’ shape. However, despite the building’s curved glass shape, the only piece of curved glass is the cap at the very top.
The shape of the building reduces the need for reinforcement to stiffen the structure and resist wind loads. Diagonal braces at the perimeter mean the floor space inside the building is free from columns.
Norman Foster’s design was inspired by ideas developed in the 1970s by Buckminster Fuller for a Climatroffice, a concept for a building to have a free-form glass skin in which a microclimate could be sustained.
The building’s ‘diagrid’ structure, a grid of diagonally-interlocking steel elements, means that each successive floor is offset, creating a spiral atrium. Gaps in each floor act as a ventilation system. Warm air is vented out of the building during warm months and drawn into the building during cold months. The energy efficient design of the building means that its consumption is thought to be 50% lower than a typical skyscraper.
[edit] Completion
The building was completed in December 2003 and opened on 28 April 2004, winning that year’s RIBA Stirling Prize in an unprecedented unanimous decision.
The building went on sale in September 2006 for £600 million. In 2007, IVG Immobilien AG and UK investment firm Evans Randall purchased the building for £630 million.
In April 2014, the building was put up for sale again, and in November 2014 was purchased by the Safra Group for £700 million.
With several commercial tenants, the building is only intermittently opened to the public. The top level dome (40th floor) houses a bar for tenants and their guests, and there is a restaurant on the 39th floor and private dining rooms on the 38th.
[edit] Project data:
- Address: St. Mary Axe, London
- Construction period: 2001 – 2003
- Height: 180 m (591 ft)
- Floor count: 41
- Floor area: 47,950 m2 (516,100 sq ft)
- Architect: Foster and Partners
- Developer: Sellar Property Group
- Main contractor: Arup
- Notable prizes: Stirling Prize 2004, First Prize – Emporis Skyscraper Award 2003, London Architecture Biennale – Best New London Building, Civic Trust Award,
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- 20 Fenchurch Street.
- BT Tower.
- Buckminster Fuller.
- City Cluster, City of London.
- City Cluster, Kit of Parts.
- City Hall, London.
- Concept architectural design.
- Dancing House, Prague.
- Guggenheim Museum, Bilbao.
- Habitat 67.
- Leadenhall building.
- Lloyd's of London.
- Luxor Las Vegas.
- Nakagin Capsule Tower.
- NatWest Tower
- Norman Foster.
- SIS Building.
- The Shard.
- Tallest buildings in the world.
- Torre Agbar.
[edit] External references
- BrightHub - The Gherkin
- Design Book Mag - Designing the Gherkin
- Foster and Partners
Featured articles and news
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.
The ISO answer to what is a digital twin
Talking about digital twins in a more consistent manner.
Top tips and risks to look out for.
New Code of Practice for fire and escape door hardware
Published by GAI and DHF.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, retrofit measures and the roles involved.
New alliance will tackle skills shortage in greater Manchester
The pioneering Electrotechnical Training and Careers Alliance.
Drone data at the edge: three steps to better AI insights
Offering greater accuracy and quicker access to insights.
From fit-out to higher-risk buildings.
Heritage conservation in Calgary
The triple bottom line.
College of West Anglia apprentice wins SkillELECTRIC gold.
Scottish government launch delivery plan
To strengthen planning and tackle the housing emergency.
How people react in ways which tend to restore their comfort.
Comfort is a crucial missing piece of the puzzle.
ECA launches Recharging Electrical Skills Charter in Wales
Best solutions for the industry and electrical skills in Wales.
New homebuilding skills hub launch and industry response
Working with CITB and NHBC to launch fast track training.
Comments