The floor area ratio (FAR), also known as the plot ratio, is a measure of the total permitted floor area of a building, in relation to the total area of the lot (or plot) on which the building stands:
Gross floor area of all floors of the building / Area of the building lot = FAR
A higher ratio indicates a higher-density environment.
The concept emerged in Europe in the 19th century, and was then taken up in the USA in the 20th century as a form of zoning control for rapidly developing cities. FAR is now often used by urban planners, particularly in the USA, for assessing, or restricting, planning permissions, setting a limit on the 'load factor' generated by new developments, beyond which undue stress is placed on a city and its infrastructure.
A low permitted FAR may deter development, whilst a higher FAR allows more usable area, and hence higher potential sales.
The same FAR value can be achieved by buildings with varying numbers of storeys. For example:
1,000 sq. m building with one storey / 4,000 sq. m lot = 0.25
500 sq. m building with two storeys / 4,000 sq. m lot = 0.25
An FAR of 1.0 allows the developer to build a one-storey building over the lot, or a two-storey building over half the lot, or a three-storey building over one-third of the lot, and so on.
An FAR of 2.0 allows the developer to build a two-storey building over the lot, or a four-storey building over half, and so on.
Bradford City Centre Design Guide, Supplementary Planning Document, published in 2006, defines plot ratio as: ‘A measure of density for non-residential use. This is expressed as a ratio in which the first number relates to the floor area of the building and the second to the area of the site. A 2:1 ratio therefore denotes a building that has two times the floor area of the site. This could be a two storey building covering the entire site or a four storey building covering half of the site.’
NB Land measurement for planning and development purposes, Guidance Note, Global 1st edition, Published by the Royal Institution of Chartered Surveyors (RICS) in May 2021, defines plot ratio (PR) as: ‘…the ratio of total development floor area to site area. Development floor area may be measured as gross external area (GEA) or gross internal area (GIA), but whichever is used – or modifications of them – should be clearly stated. Gross external area and gross internal area are defined in Property measurement, RICS professional statement.’ It suggests that floor area ratio (FAR) and floorspace ratio (FSR) are similar terms.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.