Fabrication
In construction, a ‘fabrication’ is an item that is manufactured by a fabricator for installation on a building site as part of an ongoing construction project, for example, a window, door, steel member, staircase and so on that is typically made off-site to the specification required for the project.
A building’s windows are normally fabricated off-site to special dimensions that the fabricator has either taken off the drawings or specification, or else has visited the site and measured for the item to be supplied. The fabricator can then proceed to manufacture. It should be noted that a fabrication can be termed ‘prefabricated’ if it is made off site. Delivered to site ready to install means that these items can help reduce waste and time and cut emissions.
For more information see: Prefabrication.
In theory, it is possible for fabrications to be made on site (or in a flying factory) as opposed to off site, assuming the process is simple enough (e.g timber windows) and there is enough space on site to allow the fabrication process to take place. In most circumstances however, fabricating building elements can require complex machinery that requires the controlled conditions, accuracy and space offered by a manufacturing plant.
[edit] Related articles on Designing Buildings Wiki
- Concrete frame.
- Construction problems avoided by using a modular approach.
- Crosswall construction.
- Design for Manufacture and Assembly (DfMA).
- Modular buildings.
- Offsite manufacturing.
- Off-site construction.
- Off site, on track.
- Prefabrication.
- Stainless steel.
- Steel frame.
- Structure relocation.
- The overlooked secret of off-site fabrication.
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.