Artificial ground
Artificial ground can be classified as:
- Made ground: Areas where material is known to have been placed by man on the pre-existing (natural or artificial) land surface (including engineered fill). For more information see: Made ground.
- Infilled ground: Areas where pre-existing (natural or artificial) land surface has been excavated (worked ground) and subsequently partially or wholly backfilled.
- Worked ground: Areas where the pre-existing material (natural or artificial) land surface is known to have been excavated by man.
- Landscaped ground: Areas where the pre-existing land surface (natural or artificial) has been extensively remodelled, but where it is impracticable to delineate separate areas of made ground, worked ground or disturbed ground.
- Disturbed ground: Areas of ill-defined surface disruption associated with surface or near-surface development or collapse. The disturbance is typically complex, dominated by zones of subsidence, and includes areas of worked ground and made ground.
Ref British Geographical Society rock classification scheme.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.
The ISO answer to what is a digital twin
Talking about digital twins in a more consistent manner.
Top tips and risks to look out for.
New Code of Practice for fire and escape door hardware
Published by GAI and DHF.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, retrofit measures and the roles involved.
New alliance will tackle skills shortage in greater Manchester
The pioneering Electrotechnical Training and Careers Alliance.
Drone data at the edge: three steps to better AI insights
Offering greater accuracy and quicker access to insights.
From fit-out to higher-risk buildings.
Heritage conservation in Calgary
The triple bottom line.
College of West Anglia apprentice wins SkillELECTRIC gold.
Scottish government launch delivery plan
To strengthen planning and tackle the housing emergency.
How people react in ways which tend to restore their comfort.
Comfort is a crucial missing piece of the puzzle.
ECA launches Recharging Electrical Skills Charter in Wales
Best solutions for the industry and electrical skills in Wales.
New homebuilding skills hub launch and industry response
Working with CITB and NHBC to launch fast track training.