[edit] What is the discount rate?
The New Rules of Measurement (NRM) are published by the Royal Institute of Chartered Surveyors (RICS). They provide a standard set of measurement rules for estimating, cost planning, procurement and whole-life costing for construction projects.
NRM3: Order of cost estimating and cost planning for building maintenance works, defines a ‘discount rate’ as:
The percentage rate required to calculate the present value of a future cash flow (i.e. used for bringing future costs to a comparable time base). For example, if investing at 3 per cent interest, then the present value is discounted by 3 per cent as it is worth less than future earnings due to interest. The discount rate is a factor or rate reflecting the time value of money that is used to convert cash flows occurring at different times to a common time base. |
Where the present value is:
'...the cost or benefit in the future discounted back to some base date, usually the present day, at a given compound interest rate'.
NRM3 defines the ‘treasury discount rate’ as:
'…the rate specified as the discount rate by the UK Government Treasury to be used as the discount rate for public sector whole life costing calculations.'
[edit] Other definitions
Guide to developing the project business case, Better business cases: for better outcomes, published by HM Treasury in 2018, defines the discount rate as: ‘The annual percentage rate at which the present value of a £, or other unit of account, is reduced over time. This is applied to values that are at constant prices and has nothing to do with currency inflation.'
Life Cycle Costing (BG 67/2016), written by David Churcher and Peter Tse and published by BSRIA in March 2016, defines the discount rate as: ‘The percentage by which costs or benefits occurring one year in the future are deemed to be less valuable than costs or benefits today. In life cycle costing, the discount rate is the difference between the cost of capital and the inflation rate. For public sector projects, the discount rate is 3.5% per annum. Discount rates can be expressed using different time periods (such as months) provided the study period is expressed in a consistent manner.’
ICMS: Global Consistency in Presenting Construction Life Cycle Costs and Carbon Emissions, 3rd edition, November 2021, published by the ICMS (International Cost Management Standard) Coalition, defines discount rate as a: ‘Factor or rate reflecting the time value of money that is used to convert cash flows occurring at different times (ISO 15686-5).’
[edit] Related articles on Designing Buildings
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.