Corrigendum to the 18th Edition Wiring Regulations
Contents |
[edit] Corrigendum
The Institution of Engineering and Technology (IET) and BSI have published a new Corrigendum to the 18th Edition Wiring Regulations (BS 7671:2018+A2:2022).
ECA has welcomed the changes and corrections in the Corrigendum, which help to clarify the requirements of the 18th Edition (BS 7671:2018+A2:2022) and the intent behind the Regulations.
The Corrigendum makes changes to several areas of BS 7671 and comes into effect immediately. It is available for free to download from the IET and BSI by clicking here.
ECA advises electrotechnical and engineering services contractors to note in any relevant documentation that they are completing projects to this Corrigendum, to avoid any confusion going forward.
[edit] Comment
Gary Parker, Senior Technical Manager at ECA, said:
“This corrigendum introduces several small, but very important, changes to the Wiring Regulations which ECA Members and the wider industry need to be aware of. Among these is a change to protected escape route requirements, SPD requirements, and a brand-new regulation relating to protected escape routes for medical locations.
"ECA's dedicated Technical Team will provide further detailed information for ECA Members, including a breakdown of the changes and what Members can do to stay compliant.”
ECA’s industry-leading Technical Team offers unrivalled support across a wide range of electrotechnical activities. ECA Members can access exclusive application guides, editable certificates, guidance notes, technical bulletins, and access to the ECA Technical Helpline.
Learn more about ECA Technical support, including support with AMD2 and the 18th Edition, here.
[edit] Changes
Areas of change include:
- Regulation 422.2 has been amended to clarify the scope of the provision.
- Indent (ii) of Regulation 443.4.1 has been removed. The term safety service, formerly included in Regulation 443.4.1 (ii), encompassed a wide range of systems. The provision, therefore, had unintended consequences for improvements to fire safety systems within installations.
- Table 443.2 and the Note to Regulation [IP address hidden] have been amended to remove examples of equipment.
- Regulation 701.1 has been amended to remove the reference to birthing pools.
- A new Regulation, [IP address hidden], has been included in order to modify requirements in Regulation group 422.2 for protected escape routes in healthcare facilities.
For more information on the Corrigendum and all things BS 7671:2018, please visit: www.theiet.org/updates.
This article was issued via Press Release as "ECA welcomes Corrigendum to 18th Edition Wiring Regulations", and also available from the ECA News and blog site, dated May 15.
--ECA
[edit] Related articles on Designing Buildings
- 18th Edition Wiring Regulations.
- BS 7671 Requirements for Electrical Installations.
- Articles about electricity.
- ECA articles.
- Electrical equipment.
- Electrical installation.
- Electrical power.
- Electrical safety.
- Electrician.
- Electrotechnical Assessment Specification guidance for installers.
- IET announces release of 18th Edition Amendment 2.
Featured articles and news
About the 5 Percent Club and its members
The 5% Club; a dynamic movement of employers committed to building and developing the workforce.
New Homes in New Ways at the Building Centre
Accelerating the supply of new homes with MMC.
Quality Planning for Micro and Small to Medium Sized Enterprises
A CIOB Academy Technical Information sheet.
A briefing on fall protection systems for designers
A legal requirement and an ethical must.
CIOB Ireland launches manifesto for 2024 General Election
A vision for a sustainable, high-quality built environment that benefits all members of society.
Local leaders gain new powers to support local high streets
High Street Rental Auctions to be introduced from December.
Infrastructure sector posts second gain for October
With a boost for housebuilder and commercial developer contract awards.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
COP29; impacts of construction and updates
Amid criticism, open letters and calls for reform.
The properties of conservation rooflights
Things to consider when choosing the right product.
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.