Consumer rights act 2015
A European Union Directive on consumer alternative dispute resolution (ADR) was published in July 2013. The principal obligation imposed on member states was to ensure that ADR, provided by a certified body, is available (although not mandatory) for disputes between a consumer and a business.
On 1 October 2015 the Consumer Rights Act came into force. This introduced a wide range of provisions intended to clarify and simplify consumer rights, including; clarification of rights when goods or digital content are faulty, rights when services are different from those agreed, and unfair contract terms. It also included provisions allowing businesses that sell directly to consumers to use alternative dispute resolution procedures to deal with disputes.
ADR allows disputes which parties cannot resolve themselves to be resolved without full court proceedings. ADR procedures can allow resolution more quickly, more amicably and at a lower cost. Procedures include arbitration, adjudication, mediation and so on. ADR has been mandated for some sectors for a number of years, for example construction contracts. See Alternative dispute resolution for more information.
Under the new Act businesses in sectors that are required to provide ADR, or that have voluntarily decided to adopt it, must provide consumers with details of their ADR provider on their website and, if applicable, in the terms and conditions of sales or service contracts. If they become involved in an unresolved dispute with a consumer they will have to tell the consumer that they cannot settle the dispute, whether they are prepared to deal with the dispute under ADR procedures and who the certified ADR provider is.
If they are not within a regulated sector, businesses will still not have to adopt ADR procedures. Business to business disputes are not covered by the Act, nor are disputes initiated by a business against a consumer.
The Act does however apply to consultants and trades people offering services direct to consumers.
Businesses that are affected should ensure that they have clear procedures in place for dealing with disputes and that they are compliant with the Act.
A European regulation on online dispute resolution will become law in January 2016.
[edit] Related articles on Designing Buildings
- Adjudication.
- Alternative dispute resolution legislation.
- Alternative dispute resolution.
- Arbitration.
- Competition and Markets Authority CMA.
- Consumer.
- Consumer contract.
- Consumer Contracts Regulations.
- Consumer Council for Water CCWater.
- Consumer Protection from Unfair Trading Regulations 2008 CPRs.
- Cooling off period.
- Dispute resolution boards.
- Green Claims Code.
- Housing Grants, Construction and Regeneration Act.
- Mediation.
- Med-adjudication.
- Med-arbitration.
- Scheme for Construction Contracts.
- Third party opinion and fixed-fee mediation procedures.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Preparing for the future: how specifiers can lead the way
Effective specificationand the Future Homes Standard.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February