Computers in construction tendering
Traditionally, invitations to tender, specifications, bills of quantities and other contract documents have been drawn up independently and exchanged in paper form. Today, collaborative and comprehensive software tools can support the complete process of tendering, communication is almost exclusively electronic and documents are exchanged on web sites, by email and on portable data storage devices, such as DVDs, CD-ROMs and memory cards.
The first comprehensive software tools that supported tendering procedures were introduced as early as the 1970s. Starting with punch card systems, the development of these tools led to new forms of data exchange. Since then, with the possibilities provided by the internet, spatial barriers have also been broken down. Computers can exchange tender information anywhere worldwide in real-time and digital signatures can ensure that the are binding.
Software tools support this process from the beginning with the preparation of the bill of quantities. Since databases will already store design information from a building model on the one hand, and predefined specifications on the other, quantities can be calculated and tender documents generated.
During the construction process new measurements can be filed and included, with the result that every item, as well as the total volume, is updated automatically.
Digitally transferring the bill of quantities in a structured form to the tenderers' calculation software saves time and money. On the basis of this information, the tenderer is able to calculate a price. Their tender is passed back to the client, again digitally, and all the tenders received can be compared electronically. As a result, a schedule of prices can be created by the client’s software allowing bids to be evaluated against a range of criteria. Before the contract is awarded, modifications resulting from tender negotiations or changes in conditions, contingency items, cancelled items or price changes can all be included in the final contract documents.
A digital version of the bill of quantities can also support the calculation and agreement of variations during the construction phase.
Websites have gained importance as a result of the electronic tendering (e-tender) process. There are several platforms which specialise in the tendering of private and public construction contracts. Similar to offline tools, these websites support the whole procurement process, starting with the download of an invitation to tender through to the legally binding acceptance of a tender. Public administrations and large-scale enterprises increasingly use e-tender platforms, to save cost and time (for example, the European “Tenders Electronic Daily” (TED)).
The main types of software used for the tendering process are listed below:
- Preparation of specifications and bills of quantities:
Software tools for the preparation of specifications and bills of quantities automatically relate measurement data to the corresponding specification texts according to a given item structure. The specifications are based on technical norms and can usually be inserted as standard text blocks.
- Costing and accounting:
Software tools for costing and accounting support cost estimation and analysis. These applications are used by tenderers as well as clients. Costs can be estimated and controlled on the basis of data from the bill of quantities.
- Comparative analysis of unit prices:
Software tools for the comparative analysis of unit prices are used by clients to choose between several tenderers. Predefined evaluation criteria highlight differences between tenders and support the decision-making process.
- Web-based e-tendering:
Web-based e-tendering supports the tendering process in various ways. Websites can supply data for tender inquiries and enable tender documents to be requested and dispatched. The scope varies greatly depending on the provider.
The text in this article is based on an extract from COMPUTER METHODS IN CONSTRUCTION, by Christoph Motzko, Florian Binder, Matthias Bergmann, Bogdan Zieliski, Mariusz Zabielski and Robert Gajewski. Darmstadt, Warsaw 2011. The original manual was developed within the scope of the LdV program, project number: 2009-1-PL1-LEO05-05016 entitled “Common Learning Outcomes for European Managers in Construction”. It is reproduced here in a slightly modified form with the kind permission of the Chartered Institute of Building.
--CIOB
[edit] Related articles on Designing Buildings Wiki
- Automated vendor selection.
- Bid strategies.
- Bill of quantities.
- Bill of quantities software.
- Building information modelling.
- Computers in building design.
- Computers in the management of construction.
- Computer numerical control.
- Connected procurement.
- Contract documents.
- E-auction.
- E-procurement.
- E-sourcing.
- ESPD and the decline of the PQQ.
- Houzz Pro business software.
- How to take off construction works.
- Invitation to tender.
- Microsoft Project - software for project management.
- Reverse auction.
- RFx.
- Source to pay software S2P.
- Specification.
- The benefits of e-procurement in construction.
- Tender.
- Tender documentation.
- Tender processes.
- Tender return slip.
Featured articles and news
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.
Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.