BIM maturity levels
Contents |
[edit] Introduction
Building Information Modelling (BIM) is a very broad term that describes the process of creating digital information about a building or other facility such as a bridge, highway, tunnel and so on.
The range of levels that this form of modelling can take are described as 'maturity levels' and are described below.
[edit] Level 0 BIM
Unmanaged computer aided design (CAD) including 2D drawings, and text with paper-based or electronic exchange of information but without common standards and processes. Essentially this is a digital drawing board.
[edit] Level 1 BIM
Managed CAD, with the increasing introduction of spatial coordination, standardised structures and formats as it moves towards Level 2 BIM. This may include 2D information and 3D information such as visualisations or concept development models. Level 1 can be described as 'Lonely BIM' as models are not shared between project team members.
[edit] Level 2 BIM
Managed 3D environment with data attached, but created in separate discipline-based models. These separate models are assembled to form a federated model, but do not lose their identity or integrity. Data may include construction sequencing (4D) and cost (5D) information. This is sometimes referred to as 'pBIM' (proprietary BIM).
In the UK the Government Construction Strategy published in May 2011, stated that the '...Government will require fully collaborative 3D BIM (with all project and asset information, documentation and data being electronic) as a minimum by 2016'. This represents a minimum requirement for Level 2 BIM on centrally-procured public projects.
See Level 2 BIM for more information.
[edit] Level 3 BIM
A single collaborative, online, project model with construction sequencing (4D), cost (5D) and project lifecycle information (6D). This is sometimes referred to as 'iBIM' (integrated BIM) and is intended to deliver better business outcomes.
See Level 3 BIM for more information.
[edit] Level 4 BIM
Level 4 introduces the concepts of improved social outcomes and wellbeing.
[edit] Related articles on Designing Buildings
- Asset information model.
- Benefits of manufacturer-created BIM models.
- BIM dimensions.
- BIM execution plan.
- BIM for dummies - an interview.
- Centrally procured public projects.
- Construction Operations Building Information Exchange (COBie).
- CIC BIM Protocol.
- Common data environment.
- Data drops.
- Federated building information model.
- Government Construction Strategy.
- Industry Foundation Classes.
- Information manager.
- Level 2 BIM.
- Level 3 BIM.
- Level of detail.
- Open data.
- PAS 1192-2:2013.
- PAS 1192-3:2014.
- Project information model.
- Uniclass.
[edit] External Links
- Video: BIM Maturity /// Easy as 123 (by The B1M)
BIM Directory
[edit] Building Information Modelling (BIM)
[edit] Information Requirements
Employer's Information Requirements (EIR)
Organisational Information Requirements (OIR)
Asset Information Requirements (AIR)
[edit] Information Models
Project Information Model (PIM)
[edit] Collaborative Practices
Industry Foundation Classes (IFC)
Comments
To join this discussion, click 'Add a comment' above and add your comments to the bottom of the page.
The BIM Hub is a specialised online networking platform where you can set up your individual and company profile.
The BIM Hub aim it to connect, learn and develop the BIM Community, it is for the community ran by the community. By joining The BIM Hub you can joing the BIM community and help shape the future of the construction industry.