APM responds to reports phase two of HS2 may be scrapped
Reports in the national media have suggested that Prime Minister Rishi Sunak and Chancellor of the Exchequer Jeremy Hunt are in talks about scrapping the second stage of the HS2 rail project between Birmingham and Manchester.
According to reports, the talks are due to rising costs and delays occurring with the project. It is estimated that the government has already spent £2.3bn on the second stage and that abandoning the project could save up to £34bn.
In response to these claims, Andrew Baldwin Head of Policy and Public Affairs, Association for Project Management (APM), said: “As the chartered body for the project profession, we acknowledge the importance of learning from setbacks and disruptions to major projects such as those being encountered with HS2.
“It is important to recognise however that constant scope changes to projects can have long term negative effects which can result in their intended economic and societal benefits not being fully realised. All major projects have challenges across their lifespan but the intended benefits HS2 set out to achieve must not be lost.
This article appears on the APM news and blog site as "APM responds to reports phase two of HS2 may be scrapped" dated September 15, 2023.
--Association for Project Management
[edit] Related articles on Designing Buildings
- A new capital for the UK.
- Beeching cuts.
- Cities devolution bill.
- Crossrail 2.
- Devolution.
- ECA backs joint rail electrification statement.
- Engineers make policy decisions a reality.
- Enterprise zones.
- Five great things about civil engineering.
- Gatwick second runway.
- Heritage perspectives on infrastructure.
- HS2 and community projects.
- HS2 decision.
- HS2 Phase One - safeguarding directions updated.
- High Speed 2 (HS2).
- King’s Cross Station Redevelopment.
- Lessons for transport.
- London 2012 Olympic Stadium.
- Nimbyism.
- Northern Powerhouse transport blueprint.
- Optimism over infrastructure project delivery.
- Railway engineering.
- Railway stations.
- The need for an integrated railway in the Midlands and North.
- What does the Northern Powerhouse mean for us?
Featured articles and news
Cladding remediation programmes, transparency and target date.
National Audit Office issue report on cladding remediation.
HBPT and BEAMS Jubilees. Book review.
Does the first Labour budget deliver for the built environment?
What does the UK Budget mean for electrical contractors?
Mixed response as business pays, are there silver linings?
A brownfield housing boost for Liverpool
A 56 million investment from Homes England now approved.
Fostering a future-ready workforce through collaboration
Collaborative Futures: Competence, Capability and Capacity, published and available for download.
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.