Key performance indicators KPI
Key performance indicators (KPIs) can be used to:
- Monitor costs.
- Track progress.
- Assess client satisfaction.
- Identify strengths and weaknesses.
- Compare performance across and between projects.
- Assess specific areas of a project such as sustainability, safety, waste management, etc.
It is important that KPIs are identified in tender documentation and that the regular provision of the information required to assess them is a requirement of the contract. This may require the provision of sub-contractor information where performance on specific packages is to be monitored.
KPIs may be of particular importance where the contract stipulates that the contractor will be rewarded or penalised based on their performance relative to certain indicators.
Examples of KPIs that can be used on construction projects include:
- Cost vs. budget. The budgeted cost of work that has actually been performed in carrying out a scheduled task during a specific time period.
- Project progress relative to milestones.
- Number of complaints.
- Number of incidents/accidents.
- The number of working hours spent on different aspects of the works.
- The use of materials (for example, the amount of concrete poured).
- The number of defects.
- The amount of waste generated and the amount of recycling.
- The number of variations.
KPIs are also a means to help with the rapid comprehension of the current financial position. KPIs summarise the comparison of figures against the budgeted values and also industry benchmarks that are published from the result of inter-firm comparison reports.
KPIs to track profitability may include:
- Turnover by director /partner.
- Turnover by fee earner.
- Profit by director/partner.
- Profit by fee earner.
Only genuinely important performance indicators should be monitored so that it does not simply become a time consuming paper exercise.
KPIs can also be used more broadly as part of a bench-marking exercise to assess the performance of one project relative to another, to assess businesses compared to others within the industry and to assess the performance of the industry as a whole relative to the rest of the economy.
[edit] Related articles on Designing Buildings Wiki
- Acceleration.
- Benchmarking.
- Best value.
- Budget.
- Building performance.
- Contractor's master programme.
- Defects.
- Design web.
- Earned value.
- Facility condition index FCI.
- Health performance indicators in the built environment.
- How progress is agreed in construction.
- Identifying the causes of trends in construction labour productivity.
- Information release schedules.
- Market value.
- Mechanical and electrical maintenance customer satisfaction KPI's 2017.
- Milestones.
- Performance.
- Performance requirements.
- Programme consultant.
- Progress of construction works.
- Project crashing.
- Project programme.
- Project scorecard.
- RAG rating.
- Schedule performance index (SPI).
- Short period programme.
- Strategic performance targets.
- Time-location chart.
- Time management of construction projects.
- Track record.
- Turnover.
- Variations.
- Value management.
- Whole life costs.
Featured articles and news
Awe-inspiring medieval great barns.
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Comments